Download presentation
Presentation is loading. Please wait.
Published byMarja-Leena Kyllönen Modified over 5 years ago
1
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS
MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Eight Cohesion Fund (Regulation 1164/94) Monitoring Committee Sofia, Bulgaria January 2011
2
Main Collector I – Stara Zagora
3
Strengthening after reinforcement of the excavation
Main Collector I – Stara Zagora MPR 3 Excavation works for the trench of pipe D=2000mm December 2007 Strengthening after reinforcement of the excavation
4
Main Collector I – Stara Zagora
Back fill acc. to Detail for pipes D=2000 mm Shuttering and reinforcement
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.