Presentation is loading. Please wait.

Presentation is loading. Please wait.

U Khin Maung Win Director General, Department of Electric Power

Similar presentations


Presentation on theme: "U Khin Maung Win Director General, Department of Electric Power"— Presentation transcript:

1 U Khin Maung Win Director General, Department of Electric Power
MOLFRD Summary Myanmar National Electrification Plan Workshop - November 22, Naw Pyi Taw U Khin Maung Win Director General, Department of Electric Power A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

2 Myanmar National Electrification Plan (NEP) 2015-2030
Nationwide program for electricity access scale-up Targets to achieve universal access by 2030 An action plan which includes developing, financing, and implementing Aligns support from different stakeholders which includes implementation, and financing All towards one clear goal, nationwide universal access of electricity in Myanmar A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

3 Myanmar National Electrification Plan (NEP) 2015-2030
Key Components: Geospatial Least Cost Electrification Rollout plan (grid and off-grid) RoadMap and Investment Prospectus A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

4 Geospatial Least Cost Electrification Rollout Plan
Where are people, where are industries, where is electricity demand Where are resources, what electricity supply options Costs of different technologies, sensitivity of outputs, policy Electricity Demand Technology Cost and Policy Electricity Supply options GIS- based spatial least-cost electrification plan both grid and off-grid A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

5 Road Map and Investment Prospectus
Implementing the least-cost electrification plan Road Map and Investment Prospectus Implementation? GIS- based spatial least-cost electrification plan A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

6 Roadmap and Investment Prospectus
Institutional Framework and Business Model Short-term and long-term clear targets, intermediate goals, and milestones Integrated sector-wide approach Investment financing framework, mobilizing finance Bridging finance gaps from government budget, donor grants and concessional loans, cross- subsidies etc. Strengthen institutional framework, and its capacity Clear roles and responsibilities and of key sector institutions Oversight, planning, implementation, monitoring and evaluation Attract donor funding… A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

7 The next steps Milestone Date Deliverable 1st Consultation Workshop
May 2013 Reached consensus on NEP development 2nd Consultation Workshop November 2013 Inception report, including methodology and work plan South-south Exchange January 2014 Visit of select gov officials to select countries in SEA 3rd Consultation Workshop March 2014 Interim results report 4th Consultation Workshop July 2014 Draft final results report NEP Adopted Oct 2014 Gov approval of NEP A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future


Download ppt "U Khin Maung Win Director General, Department of Electric Power"

Similar presentations


Ads by Google