Presentation is loading. Please wait.

Presentation is loading. Please wait.

Chapter 18 Spoilage, Rework and Scrap

Similar presentations


Presentation on theme: "Chapter 18 Spoilage, Rework and Scrap"— Presentation transcript:

1 Chapter 18 Spoilage, Rework and Scrap

2 Spoilage, Reworked Units and Scrap
Unacceptable units of production that are discarded or sold for net disposal proceeds Reworked units Unacceptable units of production that are subsequently reworked and sold as acceptable finished goods Scrap A product with minimal (frequently zero) sales value Either account for scrap at the time of production or the time of sale Page 676

3 Types of Spoilage Normal Spoilage
Spoilage that arises under efficient operating conditions as a result of the production process Management decision as to what is “normal” Set based on number of good units completed Allocate normal spoilage to all goods which have passed the inspection point Abnormal Spoilage Spoilage that is not expected to arise under efficient operating conditions Treated as avoidable and controllable Expense on the income statement when it occurs Pages


Download ppt "Chapter 18 Spoilage, Rework and Scrap"

Similar presentations


Ads by Google