Jerald A. Balta January 24, 2007 Propulsion Team Preliminary Cost Analysis of Balloon Based Launch Vehicle AAE 450 Spring 2008.

Similar presentations


Presentation on theme: "Jerald A. Balta January 24, 2007 Propulsion Team Preliminary Cost Analysis of Balloon Based Launch Vehicle AAE 450 Spring 2008."— Presentation transcript:

1 Jerald A. Balta January 24, 2007 Propulsion Team Preliminary Cost Analysis of Balloon Based Launch Vehicle AAE 450 Spring 2008

2 Cost Estimates Balloon Launch Location – $30,000
Gas H $/m3 Gas He – $/m3 Polyethylene – $150,000 per 15.8 MC Launch Location – $30,000 Production and Maintenance – $370,000 $200,000 personnel $150,000 maintenance $20,000 assembly $ $25000 scaled AAE 450 Spring 2008 Group Name (i.e.Trajectory Optimization)

3 Conclusions Future Work Cost of First Stage Balloon Modeling Code
H2 = $31611, $31793, $32664 He = $42429, $44106, $52499 Future Work Balloon Modeling Code Gondala Second Stage AAE 450 Spring 2008 Group Name (i.e.Trajectory Optimization)

4 References Gizinski, Stephen J. and Wanagas, John D., “Feasibility of a Balloon-Based Launch System,” AIAA International Balloon Technology Conference, Albuquerque, NM, 1991 Defense Energy Support Center, “MISSILE FUELS STANDARD PRICES EFFECTIVE 1 OCT 2007,” Aerospace Energy Reference, November 2007 AAE 450 Spring 2008 Group Name (i.e.Trajectory Optimization)

5 Feasibility Analysis Values
Gizinski, Stephen J. and Wanagas, John D., “Feasibility of a Balloon-Based Launch System,” AIAA International Balloon Technology Conference, Albuquerque, NM, 1991 AAE 450 Spring 2008

6 Conceptual Drawing Gizinski, Stephen J. and Wanagas, John D., “Feasibility of a Balloon-Based Launch System,” AIAA International Balloon Technology Conference, Albuquerque, NM, 1991 AAE 450 Spring 2008

7 Cost Code % Fixed Constants g = 9.80665; % m/s^2 % Mass Constraints
M_Gondala = ; %kg M_Rocket = ; %kg % Density of Gases Density_Air = 1.292; %kg/m^3 Density_H = ; %kg/m^3 Density_He = ; %kg/m^3 % Lifting Force Force_1_H = (Density_Air-Density_H)*g; Force_1_He = (Density_Air-Density_He)*g AAE 450 Spring 2008

8 Cost Code continued % Mass and Volume
% Mass of Balloon Material is neglected Volume_H = (M_Gondala + M_Rocket)*g / (Force_1_H - Density_H * g) Mass_Balloon_H = Density_H*Volume_H Mass_H = M_Gondala + M_Rocket + Density_H * Volume_H Volume_He = (M_Gondala + M_Rocket)*g / (Force_1_He - Density_He * g) Mass_Balloon_He = Density_He*Volume_He Mass_He = M_Gondala + M_Rocket + Density_He * Volume_He % Cost analysis of First Stage (Including sea launch costs) Balloon_Cost_H = *((Volume_H*(1/0.3048)^3/(15.8E6)))^(2/3) Balloon_Cost_He = *((Volume_He*(1/0.3048)^3/(15.8E6)))^(2/3) Cost_H = Volume_H * 0.11 * (1/0.3048)^3 + Balloon_Cost_H Cost_He = Volume_He * 1.38 * (1/0.3048)^3 + Balloon_Cost_He AAE 450 Spring 2008


Download ppt "Jerald A. Balta January 24, 2007 Propulsion Team Preliminary Cost Analysis of Balloon Based Launch Vehicle AAE 450 Spring 2008."