1 Draft Commission Decision on Intercalibration

2 Intercalibration progress
Technical work for 2nd round IC completed Agreed deadline was 31 December 2011 Scientific review early 2012 Many open issues were resolved throughout 2012 (especially for coastal/transitional)

3 Draft Commission Decision
Draft IC Decision with Annexes Annex 1 – aims achieved, no further work Annex 2 – aims partially achieved, needs to be addressed by December 2016 No more open issues identified

4 RIVERS All results in Annex 1 Future needs: NO Macrophytes
Large Rivers

5 LAKES All results in Annex 1 Future needs 1 BQE for Central-Baltic
3 BQEs for Mediterranean 4 BQEs for Eastern Continental

6 COASTAL WATERS: Many results in Annex 1 (light green)
Further results in Annex 2 (dark green) Future needs: all BQEs not in Annex 1

7 TRANSITIONAL WATERS: Few results in Annex 1 (light green)
One BQE in Annex 2 (dark green) Future needs: all BQEs not in Annex 1

8 Draft Commission Decision
Finalisation timetable: Vote in WFD Committee – January 2013 Expected publication date *** 2013

9 Follow-up work To be completed by December 2016
No new guidance foreseen – pragmatic approach recommended Requires continuity of the existing expert networks Requires continuity of the facilitating role of the Commission through JRC To be included in the new CIS work programme