Presentation is loading. Please wait.

Presentation is loading. Please wait.

Material Requirements Planning

Similar presentations


Presentation on theme: "Material Requirements Planning"— Presentation transcript:

1 Material Requirements Planning
Have your computers ready MRP requires a Professional license August 2018 Presented by: Jay Uhlenhoff

2 Agenda Introductions and Expectations The Why and the How
Forecasts (Ch. 3) MRP Wizard (Ch. 4) MRP Results (Ch. 5) Questions & Troubleshooting

3 Agenda Introductions and Expectations The Why and the How
Forecasts (Ch. 3) MRP Wizard (Ch. 4) MRP Results (Ch. 5) Questions & Troubleshooting

4 Introduction Game – I’ll Go First
Jay Uhlenhoff Consultant/Trainer/Tester since 2015 Help customers get started using MRP Only one of me – Help each other! Your future resources are in this room. Two scenario takeaways – Production of one brand, Raw materials

5 Introduction Game – Your Turn
Name, company and role Years since implementation? Experience getting started in MRP? Data preparedness for MRP?

6 Agenda Introductions and Expectations The What and the How
Forecasts (Ch. 3) MRP Wizard (Ch. 4) MRP Results (Ch. 5) Questions & Troubleshooting

7 Key Concepts A planning tool applying a simple equation to a very large data set. Review regularly then take action Get smarter about what to order and when Example: PdOs Item being produced is Supply Item(s) being consumed is Demand

8

9 MRP Process Flow Visual

10 Pop Quiz!

11 MRP Item Preparation Refresher
Raw Materials/Production Inputs? Min Order Qty, Order Multiple, Lead Days, Min/Max Stock Labels, Bottles/Cans, Packaging Materials? Min Order Qty, Order Multiple, Order Interval, Lead Days WIP Items? Wort – Brewhouse size for Min Order Qty and Order Multiple Fermentation – Lead Days

12 Use the Utilities! Planning Management Utility
Most MRP fields Item Properties Tip: Lots of items to load/change? Item Master Data Utility UoMs Make vs Buy Can delete rows in Planning Management Utility; Delete very, very responsibly. Will perform much faster

13 Just Getting Started? First, focus attention on: Then work on:
Lead Days, Order Multiple, Min Order Qty, Min Stock Then work on: Production Yield by Brand, Purchase UoMs, Max Stock, Order Interval And later get to: Tolerance Days, Preferred Vendor

14 Quick Q&A Any specific goals taking this class?
High-level MRP questions? Prior difficulty getting started with MRP?

15 Agenda Introductions and Expectations The Why and the How
Forecasts (Ch. 3) MRP Wizard (Ch. 4) MRP Results (Ch. 5) Questions & Troubleshooting

16 Forecasting can be frustrating…

17 Forecasts Extends planning beyond existing documents
Creates ability to plan further out Works in tandem with current short-term sales Can assist with both production and sales Forecasts of barrelage or sales by SKU Design a scenario with a specific forecast

18 Forecasts Consider short and/or long-term forecast
Only one forecast per scenario Data in Days, Weeks or Months Quarters? Divide by three and use Months Can be updated frequently or not at all

19 Creating a Forecast Import an existing forecast
Planning Management Utility Copy/paste into SAP Forecast feature Manual creation in Orchestrated Use SAP-generated historical sales forecast Only use as a starting point

20 Utilities > Planning Management Utility > Demand Planning
So Let’s Get To It MRP > Forecasts Utilities > Planning Management Utility > Demand Planning

21 Agenda Introductions and Expectations The Why and the How
Forecasts (Ch. 3) MRP Wizard (Ch. 4) MRP Results (Ch. 5) Questions & Troubleshooting

22 MRP Wizard 5 steps, then Results & Recommendations
Questions encouraged Compare/contrast with your new best friend

23 Step 1: Scenario Selection
Create New scenario Scenario Name is shorthand Description has more detail

24 Step 2: Scenario Details

25 Step 2: Scenario Details
Match details to screenshot recommended Days – 4 to 12 weeks; Weeks – 4 to 12 months Items to note: Date range applies to Due Date specifically Range can be adjusted after-the-fact Can later have separate Days and Weeks scenario Simulation good option during early training (or Test DB)

26 Step 3: Item Selection

27 Step 3: Item Selection Missing items aren’t flagged for MRP
Can ‘stack’ filters Items not obviously grouped > Item Properties Number of items makes a difference

28 Item Properties Great tool for creating subsets of items
Go beyond Item Groups, Process Types, etc. Larger/more complex? More likely to utilize Item Properties Setup, then Planning Mgmt Utility Examples: Subset beyond Item Group (labels, bottles) Order Interval (same time of the month) Vendor

29 Step 4: Inventory Data Source

30 Step 4: Inventory Data Source
Company vs Warehouse Company is most common, simpler to start Recommendations for Default Warehouses Heavy use of Inv. Transfers could make difference Exclude OAK01, QC, other non-available inv. Consider removing entire locations if multiple Expand/Collapse is helpful

31 Step 5: Documents Data Source

32 Step 5: Time Range

33 Step 5: Time Range Within Planning Horizon Include Historical Data
Issues with old, unclosed documents Excludes documents with due date outside range ‘Past Due Data’ column only back to Start Date Switch to down the road Include Historical Data Includes data with due dates outside range Helps identify invalid, old documents to close

34 Step 5: Sources of Demand and Supply

35 Step 5: Sources of Demand and Supply
PdOs: Both Planned and Released included Blanket agreements must be Specific type and Approved Straightforward other than the Restrict column… Check box for a document type Then click ellipsis button to the right Select all documents to include in the scenario Likely want to ignore

36 Step 5: Inventory Level

37 Step 5: Time Range Minimum Maximum Required Min-Max
Recommends to keep inventory above minimum Source of demand Maximum Restricts to not allow ending inventory higher than here Required Similar to Minimum but suggests in Purchase UoM Min-Max

38 Step 5: Inventory Level

39 The Moment You (Probably Didn’t) Wait For
And Now… The Moment You (Probably Didn’t) Wait For Click Save Scenario Click Run!!

40 Agenda Introductions and Expectations The Why and the How
Forecasts (Ch. 3) MRP Wizard (Ch. 4) MRP Results (Ch. 5) Questions & Troubleshooting

41 Step 6: Results

42 Step 6: Results – Features
Report tab vs. Recommendations tab Expand/Collapse button Preview MRP Run Results

43 Step 6: Results – Colors Black Text/Light Gray Background
Sufficient time to fulfill order recommendations Black Text/Off-White Background Fulfilling recommendations will create more supply than demand Red Text/Dark Gray Background

44 Step 6: Results – Pegging Info

45 Step 6: Results – Pegging Info

46 Agenda Introductions and Expectations The Why and the How
Forecasts (Ch. 3) MRP Wizard (Ch. 4) MRP Results (Ch. 5) Questions & Troubleshooting

47 Order Recommendation Two options to get to Order Recommendation:
Right-click in Results header MRP module menu

48 Order Recommendation Fill out Selection Criteria form
Scenario dropdown at the Top Click OK and arrive at the below screen Clicking Update creates an actual document

49 Thank You! Orchestra Software 1400 NW Compton Dr. Suite 210
Beaverton, OR 97006 P: Web: support.orchestrated.com


Download ppt "Material Requirements Planning"

Similar presentations


Ads by Google