Download presentation
Presentation is loading. Please wait.
1
Suggested Project Timeline
09/25 – Access required services locally (5 pts) 10/05 – Access required services from a known remote host (10 pts) 10/20 – Discover and access services in a decentralized setting (15 pts) 11/05 – Do the above, but most efficiently (15 pts) 11/10 – Do the above, but for multiple devices simultaneously (25 pts) 11/15 – Do the above, but with trusted devices being added (20 pts) 12/01 – Do the above, but with untrusted devices being added (up to 30 pts extra credit) Throughout – Provide documentation (10 pts)
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.