Presentation is loading. Please wait.

Presentation is loading. Please wait.

Task A: ZEUS 2002-2003 N. Brummer, L.S. Durkin, A. Lee, T.Y. Ling.

Similar presentations


Presentation on theme: "Task A: ZEUS 2002-2003 N. Brummer, L.S. Durkin, A. Lee, T.Y. Ling."— Presentation transcript:

1 Task A: ZEUS N. Brummer, L.S. Durkin, A. Lee, T.Y. Ling

2 O.S.U. History on ZEUS Joined ZEUS 1985
One of U.S. ZEUS founding members Designed and Built Optics for ZEUS Barrel Calorimeter 87,000 Scintillator Tiles 5000 Wavelength-Shifter Light Guides and Correction Masks Designed and Built FastClear Trigger Processor Fast (15sec) Cluster Finder Electron Identification Kinematic Variables E-PZ Beam Gas Rejection Manufactured Optics for Barrel Calorimeter Presampler

3 Group History on ZEUS (cont.)
Administrative U.S. ZEUS Spokesman 3 Physics Coordinators Run Coordinator Trigger Coordinator Post-Doctoral Fellows B. Bylsma, C.L.Kim, C. Ginsburg, N.Brummer K. McLean, B. Murray, S. Park, I. Park, D. Acosta Physics Chair Assist. Prof Assoc. Prof. Korea U Kyungpook U U. of Florida 3 faculty Positions out of 5 postdocs !

4 HERA Luminosity - First Interaction 1992 - Beam Vaccum graded 1997
- P Energy GeV 1997

5 Personnel 2002-2003 OSU ZEUS Effort is Bare Bones
- Nicole Brummer (100%) at DESY Trigger Coordinator - Grad Student Albert Lee at DESY

6 O.S.U. Physics Analysis 2000-2003 Structure Function and High Q2
Camille Ginsburg, Physics Coordinator Contact Interactions Jason Gilmore, Thesis Limits on Production of R-Parity Violating SUSY particles Nicole Brümmer

7

8

9

10

11

12 Search for R-Parity Violating SUSY particles

13

14 HERA Luminosity Upgrade 7X Increase
HERA has NOT Met Lumiosity Expectations Quotes Circa 1987 “ 100 pb-1 /ZEUS YEAR” “ the MC Contains 1000 pb -1 worth of data” HERA Luminosity Upgrade 7X Increase 10 Months Shutdown Sept 2000-July 2001 50 x 185 m -> 30x110 m a factor of 2.8

15 HERA II-Luminosity Upgrade Problems
Shifts Started September 2000 ZEUS and H1 Plagued with Beam Backgrounds - synchrotron radiation back scatter off beam pipe Y - p beam gas - electron beam gas understand these backgrounds Jan 2003-June 2003 shutdown Improve vaccuum Rebuild collimators Redo absorbers and coatings Luminosity Run Starts Sept. 29

16 With 7X Luminosity New Physics Analyses will be Possible !
ZEUS Detector Upgrades - Silicon Vertex Chamber - Straw Tube Tracking Chambers Fast Clear will be Important With 7X Luminosity New Physics Analyses will be Possible !

17 Physics with Polarized Beams

18 Sea Quarks well Measure, Valence Quarks Statistically Limited

19 Future ZEUS has produced quality physics in the last twelve years
HERA has completed a major luminosity upgrade problems are being worked on The Ohio State Group worked to understand accelerator backgrounds The Ohio State Group had continued to analyze new data during the shutdown With the new luminosity this group will continue to study high Q2 high x physics


Download ppt "Task A: ZEUS 2002-2003 N. Brummer, L.S. Durkin, A. Lee, T.Y. Ling."

Similar presentations


Ads by Google