TGn Overview Portland, Oregon, US July 2004

Similar presentations


Presentation on theme: "TGn Overview Portland, Oregon, US July 2004"— Presentation transcript:

1 TGn Overview Portland, Oregon, US July 2004
doc.: IEEE /0658r0 July 2004 TGn Overview Portland, Oregon, US July 2004 Bruce Kraemer, Chair July 15, 2004 Kraemer, Conexant; Hillman, AMD Bruce Kraemer, Conexant

2 IEEE P802.11 - TGn Backgrounder
July 2004 IEEE P TGn Backgrounder TGn will define the next generation standard for high speed wireless LANs. The group's basic goal is to develop a standard capable of providing at least 100Mbps throughput at the MAC service access point. Existing standards are typically designated by their peak physical data rates. For example, a has a peak data rate of 54Mbps. This amendment has chosen to use a performance metric of throughput measured at the MAC data SAP. This amendment seeks to improve the peak throughput to at least 100Mbps, measured at the MAC data SAP. Depending on the scenario, this represents an improvement of at least 4 times the throughput obtainable using existing systems. Technical mechanisms for accomplishing this have not yet been determined by the task group but may include techniques such as spatial multiplexing, channel expansion, low density coding and a variety of other MAC efficiency improvement techniques TGn has defined comprehensive Functional Requirements, Comparison Criteria, Usage Scenarios, and Simulation Environments which must be addressed by the proposals in order to be considered for the final standard. Kraemer, Conexant; Hillman, AMD

3 Additional Project Goals
July 2004 Additional Project Goals The MAC SAP interface will remain the same as for the existing standard. The MAC SAP definition shall not be altered ensuring that all LLC and MAC interfaces are compatible to and in conformance with the IEEE Architecture, Management and Internetworking standards. The proposed amendment shall introduce no architectural changes. The scope of the MAC and PHY enhancements assume a baseline specification defined by and its amendments and anticipated amendments a, b, d, e, g, h, i and j. The enhancements shall be to support higher throughput. The amendment shall not redefine mechanisms in the baseline that do not pertain to higher throughput. Some of the modes of operation defined in the HT amendment shall be backwards compatible and interoperable with a and/or g. Kraemer, Conexant; Hillman, AMD

4 No later than midnight GMT -5 No later than midnight GMT -5
July 2004 Time line You are here Monday May 17, 2004 IEEE 802 Sessions Open Monday Sep 13 No later than midnight GMT -5 Friday June 18 No later than midnight GMT -5 Friday Aug 13 80 days 30 days 50 days 30 days Event #3 Documents posted on IEEE server Technical Proposal CC Compliance Report FR Compliance Report Event #1 Issue call for proposals Event #2 Intent to present Full or Partial proposal notification submitted Event #4 All Proposals Presented in TGn Session Kraemer, Conexant; Hillman, AMD

5 Overall timeline July 2004 2003 2004 2005 2006 2007 HT SG Formed
Publication PAR Approved TGn Formed ExCom NESCOM Approval First Sponsor Letter Ballot Selection Process & Criteria Call for Proposals First WG Letter Ballot First Proposal Presentations Down Select Kraemer, Conexant; Hillman, AMD

6 Time line - Proposed Schedule Highlights
July 2004 doc.: IEEE /0658r0 July 2004 4. Time line - Proposed Schedule Highlights Issue First Letter Ballot on Draft July 2005 3 sessions to review edit (Sep, Nov, Jan, Mar) Issue First Sponsor Ballot Mar 2006 3 sessions to review & edit ( May, July, Sept) Complete Sponsor ballot – accepted by ExCom Nov 2006 Publish Mar 2007 Kraemer, Conexant; Hillman, AMD Bruce Kraemer, Conexant