Presentation is loading. Please wait.

Presentation is loading. Please wait.

Inspection Metrics Gerry Fallon.

Similar presentations


Presentation on theme: "Inspection Metrics Gerry Fallon."— Presentation transcript:

1 Inspection Metrics Gerry Fallon

2 Lab Level II Inspection Completion Rates
12/7/2018 Lab Level II Inspection Completion Rates

3 Non-Lab Level II Inspection Completion Rates
12/7/2018 Non-Lab Level II Inspection Completion Rates

4 Lab Inspection Findings By Category
12/7/2018

5 Non-Lab Inspection Findings By Category
12/7/2018

6 Lab General Finding Breakdown

7 Lab Finding Close-Out Status

8 Non-Lab Finding Close-Out Status

9 Inspection Team Update
Level II Review Initiated in Jan 2011 Process detailed for all phases Prioritized Parking Lot Items Initiatives Identified training, manual, independent reviews, pictures SOP Update Schedule of Inspections General / DCR definitions clarified Timeline between site visit and report submittal


Download ppt "Inspection Metrics Gerry Fallon."

Similar presentations


Ads by Google