November 2013Steven Foulston Technical Department Working Time model Royal Opera House Covent Garden
2
November 2013Steven Foulston UK Legal framework Working Time Regulations (1998) –48 working hours averaged over a 17 week period (Individuals can agree to work more, with no penalty to the employer) –1day off in 6 days, or 2 consecutive days off in 14. –11 hour overnight break –20 minute break per 6 hours worked. –Minimum 5.6 weeks paid annual leave. –Special rules for young people, pregnant women and overnight workers.
3
November 2013Steven Foulston Team Structure – Technical Stage Covent Garden is a rep house, at least 7 shows in rehearsal/on stage at any one time. Daily Teams – Blue and Red shift – 30 per team (Electrics/Stage/Props/Flys) Project Teams - one team allocated to Front each show - 4 teams, 7 per team. (Electrics/Stage/Props) Build crew – 1 team, 6 staff (set construction/dismantle/transport to storage warehouse)
4
November 2013Steven Foulston Daily Team work pattern Red Shift: SunMonTueWedThurFriSatSunMonTueWedThurFriSatSunMon On OffOnOffOnOff OnOffOnOffOn Blue Shift: SunMonTueWedThurFriSatSunMonTueWedThurFriSatSunMon Off OnOffOnOffOn OffOnOffOnOff Annualised Hours contract – 2496 hours per annum Equates to 48 hours per week Alternating shifts – 15 hours duration between 7.30am – 11.30
5
November 2013Steven Foulston Project Team work pattern Work follows the rehearsal/performance schedule. Hence general working hours are known up to a year in advance, but actual working times are notified the previous week. General rules: –Annualised Hours contract – 2496 hours per annum –Equates to 48 hours per week –Working window 7.30am – 11.30, maximum 15 hours per shift. –A maximum of 280 hours can be worked during a four-week period –A minimum, if called, of four hours on any working day –There must be a minimum rest period of not less than 11 hours between calls.
6
November 2013Steven Foulston Set Building team Same rules apply as per Project Team, but in practice, the team regularly work a Monday – Friday 8am – 6pm pattern.
7
November 2013Steven Foulston Issues/challenges 15 hour shift system is physically demanding, especially for older staff/those with medical conditions. 15 hour shift system is technically outlawed under the Working Time Regulations. However the Regulations allow a derogation by collective agreement. The arrangement is currently popular with staff, however there is a business risk, as they may collectively give 3 months notice to withdraw. In which case we would need to rethink our working model.