Presentation is loading. Please wait.

Presentation is loading. Please wait.

Gas Compliance System. Based on DOT 192 requirements Non-Compliance Warnings MS Windows look and feel for the user Oracle database on the server Uses.

Similar presentations


Presentation on theme: "Gas Compliance System. Based on DOT 192 requirements Non-Compliance Warnings MS Windows look and feel for the user Oracle database on the server Uses."— Presentation transcript:

1 Gas Compliance System

2 Based on DOT 192 requirements Non-Compliance Warnings MS Windows look and feel for the user Oracle database on the server Uses your corporate network and workstations Laptop or notebook ready Pocket GCS for remote use on handheld devices Modular design so you get only what you need

3 Comprehensive Module Set Management Modules –Administration (ADM) –Work Tracking (WRK) –Assigned Task Summary (ATS) –Tools & Equipment (EET) Compliance Modules –Corrosion Tracking (CTS) –Atmospheric Corrosion (ATM) –Leak Tracking (LKT) –Leak Survey (LKS) –Pressure Stations (PCS) –Valve Maintenance (VLV) –Odorant Tracking (ODR) –Pipeline Patrol (PLP) –Exposed Pipe Exam (PEX)

4 Admin Station Custom Code Categories and Values, such as these Leak Codes, can be set via the Admin Station.

5 Admin Station Locations can be added up to four levels deep: Company, District, Operating Center, and Town.

6 Admin Station Work Rules default to DOT 192 specifications, but Frequency, Due & Compliance Dates can be customized. Work Rules can be set for all modules.

7 Admin Station System Authorization can be set for all modules. Three levels of security are available. Update Access has the option for Delete as well. Three options are available for frequency of Compliance Checks.

8 Work Tracking In Work Tracking tasks can be assigned to specific employees for download to mobile devices.

9 Assigned Task Summary In Assigned Task Summary you can view the status of work assigned to a specific employee.

10 Standard Table Views All modules have standard table views with multiple category tabs.

11 Selection Criteria Several Selection Criteria are available for narrowing your search.

12 Sort/Filter Options Additionally, standard Sort…. …and Filter options are available.

13 Required Fields Required fields, highlighted in yellow, are standard throughout the application. This is a sample Test Point Inspection window.

14 Drop-Down Menus Extensive use of customizable Drop-Down menus ensures consistent data entry.

15 Compliance Warnings Compliance Warnings let operators know that tasks are Due, Past Due, or Past Compliance.

16 This is a sample Test Point Inspection window. Corrosion Tracking

17 Atmospheric Corrosion This is the ATM Survey screen.

18 Leak Survey This is the Leak Survey screen.

19 Odorant Tracking Odorant Tracking is our newest module. It tracks Odorant Test Point inspections as well as Odorizer Station inspections.

20 Odorant Tracking This is an Odorizer Station inspection screen.

21 Odorant Tracking This is an Odorant Test Point inspection screen.

22 Pressure Station This is a Pressure Station Detail screen.

23 This is a Pressure Station Inspection screen. Pressure Station

24 Clicking the ? button brings up a checklist for that item.

25 Valve Maintenance This is a Valve Inspection screen. Bold text indicates Required fields. Pictures can be attached to the inspection.

26 Pipeline Patrol This is a Pipeline Patrol screen.

27 Exposed Pipe Exam This is an Exposed Pipe Inspection screen.

28 Tools & Equipment Any Tool Type can be tracked in Tools & Equipment.

29 Pocket GCS Pocket GCS provides Inspection capability for all modules on hand-held devices, such as this Leak Survey…. …and this Pressure Control Station inspection.

30 Reports Many stock Reports are available, such as this Valve Summary List.

31 Summary DOT 192 Compliance Non-compliance Warnings Ability to assign work Comprehensive module set Standard Reports Server installation accessed from workstations Pocket version for handheld devices

32 Contact us today! To get more information, contact EEI today at 800-733-2557, or by email at sales@eei.com.sales@eei.com Thank you!


Download ppt "Gas Compliance System. Based on DOT 192 requirements Non-Compliance Warnings MS Windows look and feel for the user Oracle database on the server Uses."

Similar presentations


Ads by Google