Presentation is loading. Please wait.

Presentation is loading. Please wait.

Team Members: Maurice Casadaban (Chairman) Entergy Services

Similar presentations


Presentation on theme: "Team Members: Maurice Casadaban (Chairman) Entergy Services"— Presentation transcript:

1 Missing Measures and Compliance Elements Standard Drafting Team (CESDT)
Team Members: Maurice Casadaban (Chairman) Entergy Services John Blazekovich (Vice Chairman) Commonwealth Edison Robert Millard Mid-American Interconnected Network Norbert Mizwicki Mid-American Interconnected Network Narinder Saini Entergy Services Charles Waits Michigan Electric Transmission John Wolfmeyer Southeastern Electric Reliability Council Other Contributors: Benedict Deutsch (Former Chairman) NERC (Formerly with MRO) Joseph Wilson PJM Interconnection Dick Worthen Southeastern Electric Reliability Council Ed Davis Entergy Services Ev Lucenti Power Decisions Consulting Maureen Long NERC Ed Ruck NERC Richard Schneider NERC

2 SAR Development (SAR - Standard Authorization Request)
Develop Compliance Elements for 22 Standards Measures Compliance Monitoring and Data Retention Levels of Non-Compliance Industry comments said no changes to the Requirements NERC Standard Committee (SC) directive to compress the schedule from 4 years down to 1 year.

3 Standards Development - CESDT
Develop a template for all 22 standards On 2/17/06 the CESDT posted one standard (COM-001) Modify all 20 standards based on template (Note: INT-002 was retired and VAR-001 was picked up by another team and therefore these were removed from the CESDTs’ list) On 4/21/06 CESDT posted 20 revised standards Incorporate changes based on industry comments On 7/10/06 CESDT posted 20 revised standard Included Implementation Plan with posting The CESDT recommended balloting with minor changes to the standards SC approved standards for balloting on 9/5/06

4 CESDT – Minority views To prove compliance an entity shall provide “evidence that could include, but is not limited to…or other equivalent evidence” Delay balloting until Requirements are improved Ballot standards individually Modify Levels of Compliance to match the Sanctions Guidelines filed with the ERO application


Download ppt "Team Members: Maurice Casadaban (Chairman) Entergy Services"

Similar presentations