Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE OmniRAN TG July 2014 F2F Meeting

Similar presentations


Presentation on theme: "IEEE OmniRAN TG July 2014 F2F Meeting"— Presentation transcript:

1 IEEE 802.1 OmniRAN TG July 2014 F2F Meeting
Max Riegel, Nokia Networks (OmniRAN TG Chair)

2 July 2014 F2F Meeting Schedule: Attendence: July 14th, 2014, 2pm - 6pm
September 2012 doc.: IEEE /0996r3 July 2014 F2F Meeting Schedule: July 14th, 2014, 2pm - 6pm Gaslamp B (2nd floor) July 15th, 2014, 9am - 6pm Gaslamp CD (2nd floor) Attendence: Stephen McCann, RIM

3 Participants, Patents, and Duty to Inform
All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants [Note: Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2]: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search

4 Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at

5 Call for Potentially Essential Patents
If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted

6 Other Guidelines for IEEE WG Meetings
All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details.

7 Resources – URLs Link to IEEE Disclosure of Affiliation
September 2012 doc.: IEEE /0996r3 Resources – URLs Link to IEEE Disclosure of Affiliation Links to IEEE Antitrust Guidelines Link to IEEE Code of Ethics Link to IEEE Patent Policy Clint Chaplin, Chair (Samsung)

8 July 2014 Agenda Graphics Mon 7/14 Tue 7/15 Wed 7/16 Thu 7/17 Fri 7/18
08:00 10:00 EC Opening Plenary AN set-up MIF 10:30 12:30 Network Reference Model Juan Carlos Roger 802.11/ Mid-week Plenaries 802.1 Opening Plenary EC Closing Plenary 13:30 15:30 Sept Interim ConfCall Status Report Motions 802.1 Closing Plenary OmniRAN Opening + Reports 16:00 18:00 ITU-T Liaison response ToC Wireless SDN BoF (joint with ) Tutorials Emerging Applications BoF

9 Wireless SDN BoF Tuesday, July 15th, 16:00-18:00, Room: Gaslamp CD
Following the "Wireless SDN" BoF meeting at the January Wireless Interim, and its successor at the March 802 Plenary, we are organizing yet another such meeting for the July 802 Plenary. This will be a joint meeting of the IEEE OmniRAN TG and the IEEE WG, held in one two-hour slot. Contributions are welcome, as are further discussions on this list regarding the subject matter. You may submit contributions via the Mentor server facility of either OmniRAN or IEEE For more information, contact: Max Riegel, Chair, OmniRAN TG Roger Marks, Chair, WG Please upload contributions to the OmniRAN file space on mentor tagged by ‘Wireless SDN BoF’ Draft agenda: <

10 Agenda for July ‘14 session
Approval of minutes Reports ITU-T Liaison response P802.1CF contributions ToC Functional design and decomposition Network reference model SDN Abstraction OmniRAN organizational issues Location of September 2014 interim meeting Conference calls until Nov 2014 session Status report to IEEE 802 WGs Motions to the closing plenary AOB

11 Business#1 Call Meeting to Order Minutes taker: Roll Call
Meeting called to order by chair at 14:05 PT Minutes taker: Juan Carlos Zuniga volunteered. Roll Call Name Affiliation Max Riegel Nokia Networks Ilan Yerushalmi Marvell Juan Carlos Zuniga Interdigital Glenn Parsons Ericsson Behcet Sarikaya Huawei Ludwig Winkel Siemens Yonggang Fang ZTE Lu Huang China Mobile Jouni Korhonen Broadcom Roger Marks EthAirNet/ETRI Jim Welch INEOQUEST Ching-Tarng Hsieh ITRI Paul Bottorff HP

12 Business#2 Review of minutes Reports ITU-T Liaison response
Minutes of July 2nd conference call No issues were mentioned Reports Slides prepared for IEEE opening plenary Others Meeting of ITU-T JCA-SDN Report prepared for Wireless SDN BoF proposing submission of IEEE 802 activities ITU-T Liaison response Update created and send out on the L reflector for review until approval in closing plenary

13 Business#3 P802.1CF contributions ToC
Functional design and decomposition Network reference model SDN Abstraction No contribution received

14 Business#4 OmniRAN organizational issues
Schedule in future meetings on Tuesday afternoon, Wednesday afternoon and Thursday morning Location of September 2014 interim meeting OmniRAN strongly prefers to meet in Athens together with the wireless WGs (4/1/2) Conference calls until Nov 2014 session September 4th, October 21st, 10:00 AM Status report to IEEE 802 WGs Proposal created and presented Motions to the closing plenary 3 motions on the following slides AOB Wireless SDN BoF is following in the same room Adjourned at 15:34

15 Motion #1 To approve proposed text in document with final editorial clean-up by the IEEE chair for response to the liaison LS114 from ITU-T SG 15 Moved: Second: Voting:

16 Motion #2 To approve that OmniRAN TG is holding its September 2014 interim meeting at the IEEE 802 Wireless Interim meeting in Athens, Greece on September 15-18th, 2014 FYI: OmniRAN TG straw poll Moved: Juan Carlos Zuniga Second: Behcet Sarikaya Straw poll: 4/1/2 Moved: Second: Voting:

17 To approve that OmniRAN TG is holding conference calls on
Motion #3 To approve that OmniRAN TG is holding conference calls on Thursday, September 4th, 10:00AM ET, and Tuesday, October 21st, 10:00AM. Moved: Second: Voting:


Download ppt "IEEE OmniRAN TG July 2014 F2F Meeting"

Similar presentations


Ads by Google