Presentation is loading. Please wait.

Presentation is loading. Please wait.

Dr. Richard de Neufville

Similar presentations


Presentation on theme: "Dr. Richard de Neufville"— Presentation transcript:

1 Dr. Richard de Neufville
Massive Uncertainty Dr. Richard de Neufville Professor of Engineering Systems and Civil and Environmental Engineering Massachusetts Institute of Technology Airport Systems Planning & Design / RdN

2 Airport Systems Planning & Design / RdN
Massive Uncertainty Objective: To present realistic context of forecasting exercise Topics Evidence Consequences Airport Systems Planning & Design / RdN

3 Airport Systems Planning & Design / RdN
Causes of Uncertainty Underlying variability of phenomenon Difficulties in measurement or estimation Unforeseen or “unpredictable” circumstances Limits to valid measurement for example: behavioral patterns Airport Systems Planning & Design / RdN

4 Airport Systems Planning & Design / RdN
Evidence 1. Simple Physical Systems 2. Overall Traffic 3. Local Traffic (Worse) 4. Other Operations Airport Systems Planning & Design / RdN

5 Ratio of Real Costs to Estimated Costs for Airport Projects
Costs expressed in constant dollars Median ~= 1.25 Percent of Occurrences Real/Estimated Cost Ratio Airport Systems Planning & Design / RdN

6 Cost of asphalt rising Local road repairs are likely to lag
By Kay Lazar, Globe Correspondent June 8, 2006 The soaring cost of petroleum -- a primary ingredient of asphalt -- has forced many communities to shoulder a 50 percent increase in costs as crews head out to repave roads this summer. Asphalt sticker shock is creating heartburn for legions of highway chiefs, prompting many to significantly curtail the number of roads they intend to repair this season. And the going may get even tougher. Two major asphalt suppliers for the region are warning of another 50 percent increase by Thanksgiving -- in addition to potential shortages Airport Systems Planning & Design / RdN

7 Cost Growth for Various Projects
3.0 2.5 2.0 1.5 1.0 0.5 0.0 Ratio of Actual to Estimated Cost DOD60 HWAY WATER BLDNG DOD50 ADHOC MAJOR ENRGY NASA NASA AVG St.Dev. CONST SAT m g Airport Systems Planning & Design / RdN

8 NASA Projects Cost Growth
3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 Ratio of Actual to Estimated Cost HST GLL UARS GRO COBE MGL MOBS LSAT EUVE ERBE AVG St.Dev. Airport Systems Planning & Design / RdN

9 Airport Systems Planning & Design / RdN
Results of a 2004 study Adapted from: Terminal Area Forecast (TAF) Accuracy Assessment Results Jerome Friedman, MITRE CAASD, Sept. 30, 2004 Airport Systems Planning & Design / RdN

10 Airport Systems Planning & Design / RdN
Results of a 2004 study Adapted from: Terminal Area Forecast (TAF) Accuracy Assessment Results Jerome Friedman, MITRE CAASD, Sept. 30, 2004 Airport Systems Planning & Design / RdN

11 Recent Error Data from U.S Source: MITRE CAASD and FAA
Airport Systems Planning & Design / RdN

12 Recent Error Data from U.S Source: MITRE CAASD and FAA
Airport Systems Planning & Design / RdN

13 Airport Systems Planning & Design / RdN
Actual vs. Forecast 10 years earlier Source: FAA Aerospace Forecast FY Note: These are aggregate NATIONAL data, in which greater local variations tend to cancel each other out Airport Systems Planning & Design / RdN

14 Older FAA Forecasts vs. Actual Data (% Difference)
Review of the FAA 1982 National Airspace System Plan Airport Systems Planning & Design / RdN

15 Forecast vs. Actual International Pax in Japan
Airport Systems Planning & Design / RdN

16 Forecast vs. Actual International Pax to Japan
Airport Systems Planning & Design / RdN

17 Forecast vs Actual International Pax in Sydney
Airport Systems Planning & Design / RdN

18 ACTIVE GENERAL AVIATION AIRCRAFT
1980 FORECAST Airport Systems Planning & Design / RdN

19 ACTIVE GENERAL AVIATION AIRCRAFT
1985 FORECAST Airport Systems Planning & Design / RdN

20 1990 FORECAST ACTIVE GENERAL AVIATION AIRCRAFT
Airport Systems Planning & Design / RdN

21 1998 FORECAST ACTIVE GENERAL AVIATION AIRCRAFT
Airport Systems Planning & Design / RdN

22 Summary and Recommendations
Forecast Errors have been large Likely to continue Recommendations: Expensive Forecasting is cost-ineffective Use general trends ...With large ranges Flexible Approach to Planning!!! Airport Systems Planning & Design / RdN


Download ppt "Dr. Richard de Neufville"

Similar presentations


Ads by Google