Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison from to Date: 10 November, 2016 November 2016

Similar presentations


Presentation on theme: "Liaison from to Date: 10 November, 2016 November 2016"— Presentation transcript:

1 Liaison from 802.15 to 802.18 Date: 10 November, 2016 November 2016
Name Affiliation Address Phone Jay Holcomb, Vice-Chair Itron, Inc. 2111 N. Molter Liberty Lake, WA 99019 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Jay Holcomb, Itron, Inc.

2 November 2016 Overview This document summarizes the activities of the IEEE Working Group for IEEE RR-TAG during the November 2016 IEEE 802 Plenary Meeting at the Grand Hyatt, San Antonio, TX, USA. Jay Holcomb, Itron, Inc.

3 Task Group Status (1/2) November 2016 Task Group Closing Reports:
CLOSING REPORT: TG3d 100G THZ - KUERNER /0836r00 CLOSING REPORT: TG3e HRCP (HIGH RATE, CLOSE PROXIMITY) - ESTRADA /0844r00 CLOSING REPORT: TG4s SRU (SPECTRUM RESOURCE UTILIZATION) - KITAZAWA /0849r01 CLOSING REPORT: TG4t HRP (HIGHER RATE PHY) - POWELL /0781r01 CLOSING REPORT: TG4v RSGB Regional Sub-GHz band updates - BEECHER /0788r01 CLOSING REPORT: TG7m (7r1) OWC (OPTICAL WIRELESS COMMS) - JANG /0850r00 CLOSING REPORT: TG8 PAC (PEER AWARE COMMUNICATIONS) - LEE /0837r00 CLOSING REPORT: TG10 L2R (LAYER 2 ROUTING) POWELL /0780r01 CLOSING REPORT: TG12 ULI (UPPER LAYER INTERFACE) KINNEY /0761r01 Jay Holcomb, Itron, Inc.

4 Study & Interest Group Status
November 2016 Study & Interest Group Status SGs n/a IGs CLOSING REPORT: IG LPWA (low rate wide area) - Robert /0839r00 CLOSING REPORT: IG HRRC (HIGH RATE RAIL) - KIM /0840r00 CLOSING REPORT: IG DEP (DEPENDABILITY - KOHNO /0795r01 CLOSING REPORT: IG THZ - KUERNER /0803r00 SCs CLOSING REPORT: IETF/WNG/WG RULES/MAINTENANCE - KINNEY /0759r02 11-15 REG SC KENNEDY /1328r01 Note: This is the last meeting of this standing committee. Moving forward all spectrum regulatory activities will be done in , the RR-TAG. Jay Holcomb, Itron, Inc.

5 Other Group Status November 2016 Liaison Reports
LIAISON REPORT - Petrick /0834r00 LIAISON REPORT - Holcomb /0797r00 LIAISON REPORT - Shellhammer n/a LIAISON REPORT - Godfrey/Rolf verbal Jay Holcomb, Itron, Inc.

6 802.15 Meeting Close The 802.15 WG adjourned Thursday evening
November 2016 Meeting Close The WG adjourned Thursday evening The next face to face meeting of the WG will be the Interim 15 – 19 January 2017 at the Grand Hyatt in Buckhead, Atlanta, GA, USA Jay Holcomb, Itron, Inc.


Download ppt "Liaison from to Date: 10 November, 2016 November 2016"

Similar presentations


Ads by Google