Presentation is loading. Please wait.

Presentation is loading. Please wait.

RR-TAG (802.18) Liaison Report

Similar presentations


Presentation on theme: "RR-TAG (802.18) Liaison Report"— Presentation transcript:

1 RR-TAG (802.18) Liaison Report
April 2009 doc.: IEEE /xxxxr0 March 2010 RR-TAG (802.18) Liaison Report Date: Authors: Rich Kennedy, Research In Motion Rich Kennedy, Research In Motion

2 April 2009 doc.: IEEE /xxxxr0 March 2010 Abstract This presentation is the midweek plenary report of the liaison for the IEEE 802 Plenaryt in Orlando, Florida. Rich Kennedy, Research In Motion Rich Kennedy, Research In Motion

3 Regulatory AHC Activities
March 2010 Regulatory AHC Activities Presented regulatory summaries from North America, the EU and Asia Reviewed the latest information regarding EN revision Decided to have generate comments for the Ofcom 600 MHz consultation Started reviewing the just released FCC “National Broadband Plan” Input to Congress; needs approval before rules will be forthcoming Rich Kennedy, Research In Motion

4 IEEE 802.18 Activities Re-elected Chair and Secretary
March 2010 IEEE Activities Re-elected Chair and Secretary Ofcom consultation: “Digital dividend: 600 MHz band and geographic interleaved spectrum, Consultation on potential uses” Reviewed with representative of Ofcom Will develop answers to some of the 12 questions Initiative to enable g to operate in the MBAN spectrum 2360 to 2390 MHz and 2390 to 2400 MHz bands Reviewed “Public Consultation/Call for Input in preparation for the Radio Spectrum Policy Programme” Rich Kennedy, Research In Motion

5 April 2009 doc.: IEEE /xxxxr0 March 2010 References Rich Kennedy, Research In Motion Rich Kennedy, Research In Motion


Download ppt "RR-TAG (802.18) Liaison Report"

Similar presentations


Ads by Google