Presentation is loading. Please wait.

Presentation is loading. Please wait.

WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077

Similar presentations


Presentation on theme: "WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077"— Presentation transcript:

1 WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077
Leader: Per Ohlund / Kazuki Kobayashi

2 Lab process-EV meeting in Brussels
15th of November at JAMA office in Brussels. Validation phase 2 result was reported by ACEA. (Japan reported validation phase 2 result on 6th of November.) Open issues were discussed. Some of open issues were closed.

3 Validation phase 2 result
Items Validation results Conclusion Time after Range test until start of charging . Current proposal within [30 minutes] 30 minutes is too short. Within 2 hours (same as ISO) Order of CD and CS test There is no impact. Order of test should be flexible. RCB correction Regulated pollutant (NOx,HC,CO,PM,PN) There is no impact Regulated pollutant should not be corrected Additional pollutant Additional pollutant should not be corrected. Closed Closed Closed Closed

4 Validation phase 2 result
Items Validation results Conclusion RCB correction window Current proposal Within 1 % To be analyzed VP2 result. Vehicle classification 30 minute maximum power 30 minutes power is not appreciate Still open Break off criteria for Range test Japanese proposal 4sec and within 15sec stop VP2 were conducted by 4sec. Waiting ACEA answer TBD TBD TBD

5 Validation phase 2 result
Items Validation results Conclusion CD to CS mode break off clitella. ACEA will propose Break time between cycle Current :10minutes Proposal is too short. Especially diesel vehicle needs at least 40 min. Not only E-Lab ->MCTF TBD TBD

6 Open issues Items Proposal Conclusion Run in mileage. BEV 300 km
OVC HEV and NOVC HEV should be same as ICE vehicle. km Agreed Soak condition Forced cooling Not allow forced cooling condition Still open Mode construction Japan propose to conduct 4 phase test Utility Factor ACEA will propose a calculation method. Closed TBD TBD TBD

7 DRAFT Confirmation test Shorten test procedure for BEV range test.
Calculation method for each phase range by complete WLTC. CD to CS break off criteria confirmation RCB correction window confirmation. FCV test procedure DRAFT

8 Prepare test parameter
Road map 2012 Jan Feb Mar Apr May Jun Jul Aug Oct Nov Dec Meetings E-lab action 65th GRPE Ad-hoc GRPE DTP 66th GRPE Ad-hoc WLTP gtr Ver1 gtr Ver2 gtr Ver3 gtr final Reflect Closed open issues Confirmation test Still open issues E-Lab meeting Prepare test parameter


Download ppt "WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077"

Similar presentations


Ads by Google