Presentation is loading. Please wait.

Presentation is loading. Please wait.

Monitoring vs Evaluation

Similar presentations


Presentation on theme: "Monitoring vs Evaluation"— Presentation transcript:

1 Monitoring vs Evaluation
Monitoring implies ____________________ NNMRR Act: ongoing nutrition surveillance surveys Evaluation implies ______ “the measurable determination of the value or degree of success in achieving specific objectives”

2 Monitoring Systems for pregnant women…
CDC Pregnancy Nutrition Surveillance System “convenience population” Pregnancy Risk Assessment Monitoring System mail and phone survey population-wide

3 Why Evaluate? _________ your program __________ your program methods
effectiveness content correct weaknesses __________ your program “However beautiful the strategy, you should occasionally look at the results.” --Winston Churchill

4 Formative vs. Summative Evaluation
_________ = process of testing certain elements of a program before it is fully implemented __________ = research at the end to determine program effectiveness

5 What to Evaluate? outcome impact (behavior change) process structure
cost-benefit analysis

6 Formative Evaluation Tools
focus groups test with small samples expert review client review check for readability… do a “dry run”

7 Summative Evaluation Tools
post test surveys (compare to assessment “pretests”) interviews monitor community health outcomes Summative evaluation activities should match ___________ and ________


Download ppt "Monitoring vs Evaluation"

Similar presentations


Ads by Google