Presentation is loading. Please wait.

Presentation is loading. Please wait.

Similar presentations


Presentation on theme: ""— Presentation transcript:

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22 2 / 7 MW Generators, V-16 Enterprise Gen sets / 14 MW Power Plant, dual fuel, 8338 HP, 450 RPM, 4160 V, less than 13,000 hours, General: Fourteen (14) Megawatts total between both units Approximate hours –14,700 & 12,300 Both are in pristine condition Everything you could possibly need to run them on gas or liquid fuel is included All the gas regulators, filters, air start, pumps, motors, cooling, exhaust, air intake filters, an assortment of spare parts, manuals, test equipment, etc. are also included They are currently configured to run on # 2 fuel, however, they will run on bio diesel, # 6 fuel oil (HFO), bunker fuels, mixed industrial fuel, LNG, LPG or methane (note: all gas conversion equipment is included) Units are currently off line and in a heated dry facility, Complete with Drawings.pumpsmotors 2 / 7 MW Generators, V-16 Enterprise Gen sets / 14 MW Power Plant, dual fuel, 8338 HP, 450 RPM, 4160 V, less than 13,000 hours, General: Fourteen (14) Megawatts total between both units Approximate hours –14,700 & 12,300 Both are in pristine condition Everything you could possibly need to run them on gas or liquid fuel is included All the gas regulators, filters, air start, pumps, motors, cooling, exhaust, air intake filters, an assortment of spare parts, manuals, test equipment, etc. are also included They are currently configured to run on # 2 fuel, however, they will run on bio diesel, # 6 fuel oil (HFO), bunker fuels, mixed industrial fuel, LNG, LPG or methane (note: all gas conversion equipment is included) Units are currently off line and in a heated dry facility, Complete with Drawings.pumpsmotors Thank you for your interest please confirm your travel dates for inspection And advise us of the number in your party.


Download ppt ""

Similar presentations


Ads by Google