Presentation is loading. Please wait.

Presentation is loading. Please wait.

August 19, 2010 Calgary, Alberta, Canada Session #68.5

Similar presentations


Presentation on theme: "August 19, 2010 Calgary, Alberta, Canada Session #68.5"— Presentation transcript:

1 August 19, 2010 Calgary, Alberta, Canada Session #68.5
802.16m Closing Report August 19, 2010 Calgary, Alberta, Canada Session #68.5 IEEE m-10/0026r1

2 802.16m Closing Report – Calgary
Into Session #68.5: SB first recirculation: 83% return rate; 62% approval SB Comments to be resolved at Session #68.5 on D7 Amendment Text ( /0045) 408 technical: 287 MAC (10 Maintenance) 56 PHY 12 General 53 Other 117 editorial comments 932 +/-4 reply comments 130 contributions 75 MAC 23 PHY 6 Femto/SON 2 Multi-BS MIMO 2 Relay 0 LBS 11 e-MBS 11 Other IEEE m-10/0026r1

3 802.16m Closing Report- Calgary
Results for the week: Resolve ALL Sponsor Ballot comments (ONLY focus) - DONE No SDD CRs Authorize Editor to create D8 and request SB recirc #2 - DONE Discuss liaison from ITU-R provides details and the timeline for the ongoing work on Recommendation ITU-R M.[IMT.RSPEC] - DONE Discuss WorkPlan and schedule – DONE Reviewed PAR Extension Request Renewed PICS Ad Hoc activities IEEE m-10/0026r1

4 802.16m Opening Report- Calgary
Results for the week (cont): Logistics: Approximately 80 attendees Conducted two primary parallel sessions all week (PHY & MAC) Two parallel daytime SB comment resolution sessions Common session on Thursday AM & PM (9:00 PM-5:00PM) Also see TGm Final Agenda, m-10/0025r3 IEEE m-10/0026


Download ppt "August 19, 2010 Calgary, Alberta, Canada Session #68.5"

Similar presentations


Ads by Google