Presentation is loading. Please wait.

Presentation is loading. Please wait.

AAQG RMC Surveillance Team Report 2011

Similar presentations


Presentation on theme: "AAQG RMC Surveillance Team Report 2011"— Presentation transcript:

1 AAQG RMC Surveillance Team Report 2011
Susie Neal September 13, 2011

2 Briefing Purpose Topics Include Review 2011 Surveillance Schedule
To discuss surveillance team initiatives, 2011 Oversight Schedule Topics Include Review 2011 Surveillance Schedule Improvement Initiatives

3 Team Members Susie Neal, Lead Lori Scheid-Gillespie Robert Bodemuller
Tim Lee Vince May Stephen LaScala Judy Chapman Darrell Taylor Kristine Armstrong Will Tate Bryan Milne Goodrich Corporation ANAB Ball Aerospace Boeing Honeywell Northrop Grumman Parker Raytheon Rockwell Collins Triumph Gulfstream

4 2011 Office Assessments Conducted – 27 Scheduled with Dates- 100%
Independent Assessments Goodrich Gulfstream Rockwell Collins Need Appendix K’s Triumph

5 2011 Witness Assessments Conducted – 21 Scheduled
3 assessments to be confirmed, showing tentative dates Independent Assessments- Aveos Bombardier Lockheed Martin Raytheon Rockwell Collins Need Appendix K’s Spirit

6 Actions Requested Independent Assessments
OEM’s to confirm dates by October 1, 2011 Appendix K’s OEM’s to send missing reports by October 1, 2011 2012 Oversight Assessment Assigned OEM’s for 2011 will conduct assessments for current CB’s Send oversight assessor names for each current CB to Susie Neal by November 1, 2011 Anyone interested in assuming the role of Oversight Chair, please send your name to Susie Neal and Vince May by October 1, 2011

7 Improvement Initiatives
Metrics OASIS Develop Standard Process for CB Report Cards Supporting OPMT Initiatives


Download ppt "AAQG RMC Surveillance Team Report 2011"

Similar presentations


Ads by Google