Presentation is loading. Please wait.

Presentation is loading. Please wait.

Purpose Top-down approach for TGh from D1.1 to D2.0

Similar presentations


Presentation on theme: "Purpose Top-down approach for TGh from D1.1 to D2.0"— Presentation transcript:

1 Purpose Top-down approach for TGh from D1.1 to D2.0
Month 2000 doc.: IEEE /xxx January 2002 Purpose Top-down approach for TGh from D1.1 to D2.0 Guides the group through the discussions Supporting information for the agenda Mika Kasslin, TGh chair John Doe, His Company

2 TPC Topics TPC.1) Power Constraint element (7.3.2.16)
Month 2000 doc.: IEEE /xxx January 2002 TPC Topics TPC.1) Power Constraint element ( ) New format proposed in 01/664r0 TPC.2) Power Capability element ( ) TPC.3) TPC Report element ( ) Transmit Power field syntax TPC.4) Tolerances Transmit power Measurements, link margin TPC.5) TPC procedures (9.11) TPC.6) New definitions transmit power receiver power Mika Kasslin, TGh chair John Doe, His Company

3 General Topics GEN.1) Action Frame definition GEN.2) Reason Code
Month 2000 doc.: IEEE /xxx January 2002 General Topics GEN.1) Action Frame definition New format proposed in 01/665r0 Defined in and used in 7.4 of 01/664r0 GEN.2) Reason Code Changes proposed in of 01/664r0 GEN.3) Status Code Changes proposed in of 01/664r0 GEN.4) New channels ( MHz) listed GEN.5) PICS skeleton in 01/664r0 GEN.6) MIB proposal in 01/533r0 and 01/664r0 Mika Kasslin, TGh chair John Doe, His Company

4 DFS Topics DFS.1) Channel Switch Announcement element
Month 2000 doc.: IEEE /xxx January 2002 DFS Topics DFS.1) Channel Switch Announcement element Re-edit in 01/664r0 DFS.2) Use of containers Discussed in Austin Defined and used in 01/664r0 (frame -> element -> container) DFS.3) IBSS Proposal in 01/532r0 DFS.4) BSS Mechanism and reports in D1.1 DFS.5) DFS procedures Text proposal in 01/664r0 Mika Kasslin, TGh chair John Doe, His Company

5 DFS Framework Issues Start-up phase: Normal operation: Common: Ideas:
Month 2000 doc.: IEEE /xxx January 2002 DFS Framework Issues Start-up phase: start-up test period (no less than 30 seconds) How about upper limit? start-up phase rate Normal operation: periodicity of quiet periods to listen radar signals Tailored for HL/2 with 2 ms frames Amount of quiet periods (20%) channel switch time (6 ms) Common: response time (100 ns) Ideas: more heuristic methods taking into account radar characteristics frequency range periodicity Mika Kasslin, TGh chair John Doe, His Company


Download ppt "Purpose Top-down approach for TGh from D1.1 to D2.0"

Similar presentations


Ads by Google