Presentation is loading. Please wait.

Presentation is loading. Please wait.

Improving LSPCM Applying LSPCM - product area Tests to an offshoring project By Soundarya Lakshmi. M.

Similar presentations


Presentation on theme: "Improving LSPCM Applying LSPCM - product area Tests to an offshoring project By Soundarya Lakshmi. M."— Presentation transcript:

1 Improving LSPCM Applying LSPCM - product area Tests to an offshoring project
By Soundarya Lakshmi. M

2 Contents Introduction LSPCM Specific criteria for Testing
Project in hand Research Objectives Issues and Deliverables / SET Seminar 11/22/2018

3 Introduction Overview Software project failure.
Software certification. Certification for an offshore project. “Top 25 risk factors according to Iacovou, C.L. & Nakatsu, R. 2008, ‘A risk profile of offshore-outsourced development projects’, Communications of the ACM, No 6, Vol 51, p89-94” / SET Seminar 11/22/2018

4 LSPCM LaQuSo Software Product Certification Model.
A rule based software product certification model. Model consists of 6 product areas: Context description User requirements High Level design Detailed design Implementation Tests / SET Seminar 11/22/2018

5 Specific criteria for Testing.
Complete Uniform Conformance Manual check Eg: Each test describes steps to be executed. / SET Seminar 11/22/2018

6 Project in hand Legacy system was - excel sheets.
Project - A Developed stand alone system for distribution of budget for a particular government body. 3 models involved in the developed stand alone system. / SET Seminar 11/22/2018

7 Objectives Improve LSPCM - Applying LSPCM 1.1 to the testing of an offshore project. Scaling of certification and specific criteria for testing. / SET Seminar 11/22/2018

8 Issues Some issues faced with respect to the tests are:
Few tests do not describe the step to be executed. Issues found in LSPCM Few rules are redundant Report records actual results. Reports describe actual output. / SET Seminar 11/22/2018

9 Deliverables Analysis report on model 1 for testing
Reports on interviews with project experts. Interviewed clients- got overview of the working of the system which made my analysis simpler. List of suggestions what LSPCM criteria are of less importance and why. List of suggestions how LSPCM can be improved for outsourcing projects. / SET Seminar 11/22/2018

10 Timeline

11 Questions / SET Seminar 11/22/2018


Download ppt "Improving LSPCM Applying LSPCM - product area Tests to an offshoring project By Soundarya Lakshmi. M."

Similar presentations


Ads by Google