Presentation is loading. Please wait.

Presentation is loading. Please wait.

Cloud Migrations Pose Important Questions

Similar presentations


Presentation on theme: "Cloud Migrations Pose Important Questions"— Presentation transcript:

1 Cloud Migrations Pose Important Questions
Complexity? Multi tier apps (SAP), large DBs, app rewrites Labor? Specific expertise needed, agent installs/config Scale? Lots of workloads, process efficiency, automation Risk? Avoid downtime, lengthy data transfers, testing, rollback Cloud migration tools built for disaster recovery add more complexity: software agents – transfer data first – complex cutovers – no rollback

2 Migrations Require a Purpose-Built, Differentiated Solution
Differentiator Which Provides… And Results In… Speed Real-time streaming, WAN optimizations Stateful workloads boot in cloud in minutes Apps begin running 10x faster Meet project timelines (and budgets) Start other IT projects sooner Save thousands w/o redundant HW/SW Simplicity No agents to install, configure, manage Automatically adapts workloads for cloud Familiar mgmt. console (VMW) No UI learning curve Reduced troubleshooting throughout project ~ 5+ manual labor hours saved per server Scale Automated orchestration, scale-out arch. Dozens of VMs per hour Migrate 1000s in total Continuous backup during migration Rely on automation (not manual labor) Complete projects in fewer phases, stages Migrate 100s as if it were a single VM Safety Test before you migrate Fast on-prem rollback No-sync cutovers Reduced downtime, especially for production apps Avoid cloud vendor or regional lock-in Speed Real-time streaming, WAN optimizations Stateful workloads boot, operational in cloud in minutes Apps begin running 10x faster Which results in: Meet project timelines (and budgets) Start other IT projects sooner Save thousands by eliminating redundant HW/SW sooner Simplicity Agentless Automatically adapts workloads for cloud target Familiar mgmt. console (VMW) No UI learning curve Reduced troubleshooting throughout project ~ 5+ manual labor hours saved per server Scale Automated orchestration & scale out architecture Dozens of VMs per hour Migrate 1000s in total Continuous backup during migration Rely on automation instead of extensive manual labor Complete projects in fewer phases, stages Migrate 100s as if it were a single VM Safety Test before you migrate Fast on-prem rollback No-sync cutovers Reduced downtime, especially for production apps Avoid cloud vendor or regional lock-in

3 Velostrata’s Agile Migration & Mobility Solution – How it Works
Data Center Velostrata on-prem Cache Velostrata Cloud Cloud Storage Storage 1 Step 1: Deployment and Architecture Data Center: Physical and virtual servers For Physical, there are additional steps not in the graphic: Install the Velos RPM (Linux Only) or load the Velostrata Connector Image into RAM Boots the physical server from virtual media (iLO/iDRAC) Stub VM is automatically created into vCenter for management with Velostrata (perform operations normally) Simple Management: vCenter Web plug-in PowerShell Module REST API Cloud Deployment: Support for AWS and Azure; Google Cloud Platform coming soon. Deployed in clusters Dual-node, active/active Scale, High availability All links between on-prem and cloud are highly WAN-optimized Step 2: Agentless Streaming Run in cloud in minutes Auto adapt to cloud Test before/while migrating Step 3: Migrate storage In background While workload runs Instant rollback Step 4: Detach from on-prem Convert to cloud-only Or rollback (if needed) 2 3 4 Easy Deployment, Management Agentless Streaming Migrate storage Detach from on-prem

4 Velostrata Delivering Migration Success, Tangible Benefits
More Success Stories Rescued migration that was 6-months behind schedule Went from 30 VMs per week to 30 VMs per day Replication solutions were not working; way behind. POC complete in just 2 days (4 apps, 4TB) 100X faster running workloads in cloud 10X faster project completion: 6 months to 2 weeks In-cloud pre-migration testing to validate app performance Now on track to meet schedule goals! “We migrated servers to the cloud in about ten minutes. This was very quick and proves this is a fast approach, and I am absolutely convinced this is the correct approach for us moving forward” Saved $2.8M+ w/ reduction of 5+ labor hours per server Automated mass migration of thousands of VMs

5 Need to mass migrate a customer into Azure?
DO YOU: Need to mass migrate a customer into Azure? Seek migration success with speed, scale, simplicity, and safety? Lack confidence in other migration tools you’ve seen or tried? Get in touch – we’ll line up a demo or PoC right away! velostrata.com/cloud-migration


Download ppt "Cloud Migrations Pose Important Questions"

Similar presentations


Ads by Google