Presentation is loading. Please wait.

Presentation is loading. Please wait.

Supplementary Plenary Information - May 2011

Similar presentations


Presentation on theme: "Supplementary Plenary Information - May 2011"— Presentation transcript:

1 Supplementary Plenary Information - May 2011
doc.: IEEE /0484r0 May 2011 Supplementary Plenary Information - May 2011 Date: 2011-May-08 Authors: Name Company Address Phone 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) Bruce Kraemer Marvell marvell .com Abstract: Additional Information on topics for WG11 interim meeting – May 2011 Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

2 Monday May 2011 May 2011 doc.: IEEE 802.11-11/0484r0
Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

3 IEEE LOA Database http://standards.ieee.org/db/patents/pat802_11.html
May 2011 Monday Agenda Item 3.2.1 IEEE LOA Database 18 entries with 2010 submission dates 5 entries with 2011 submission dates Bruce Kraemer, Marvell

4 Monday Agenda 4.1.3 Joint Meetings
May 2011 Monday Agenda Joint Meetings External Internal None planned for May Bruce Kraemer, Marvell

5 Monday Agenda 4.1.4 Group Room assignments
May 2011 Monday Agenda Group Room assignments WG Room Location 18 Grand Salon G Main Building- 2nd floor 19 Desert Vista A Conference Center 20 - no meetings - 21 22 Grand Salon H 23 Bruce Kraemer, Marvell

6 Monday Agenda 4.1.5 - WG18 Agenda
May 2011 doc.: IEEE /0484r0 May 2011 Monday Agenda WG18 Agenda Monday 11:00- 6:00 pm Tuesday 8:00 – 6:00 pm Wednesday 8:00 – 6:00 pm Thursday 8:00 – 6:00 pm interest in x Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

7 WG19 Agenda - May Monday Agenda Item 4.1.6 May 2011
Bruce Kraemer, Marvell

8 Coexistence Assurance (CA) documents
May 2011 Coexistence Assurance (CA) documents Standard Coexistence Assurance Document IEEE f IEEE /918r0 IEEE e IEEE /737r0 IEEE g IEEE /668r1 IEEE i IEEE /808r0 IEEE ac IEEE /1025r3 IEEE a IEEE Standard. Annex E IEEE c IEEE /22r9 IEEE h IEEE /07r0 IEEE y IEEE /2066r1 IEEE n IEEE /0338r4 IEEE b Bruce Kraemer, Marvell

9 May 2011 IEEE  CONTACT INFORMATION IEEE WG Chair: Steve Shellhammer IEEE WG Vice Chair: Ivan Reede IEEE WG Secretary: Junyi Wang Liaison to : Eldad Perahia Liaison from : Prabodh Varshney Liaison from : Junyi Wang IEEE Liaison: Matthew Sherman  Liaison from : Ivan Reede Bruce Kraemer, Marvell

10 Meeting May 16-19 in Alberta Canada
Monday Agenda Item 4.1.7 WG21 Agenda - May Meeting May in Alberta Canada Hhttps://mentor.ieee.org/802.21/dcn/11/ session-44-agenda.docx Bruce Kraemer, Marvell

11 WG22 Agenda - May Monday Agenda Item 4.1.8 May 2011
Bruce Kraemer, Marvell

12 Emergency Services SG – WG23
May 2011 Monday Agenda Item 4.1.9 Emergency Services SG – WG23 voting members attending get credit No information for May – Meeting elsewhere Bruce Kraemer, Marvell

13 802.11 Topics for July 2011 EC Begin Sponsor Ballot
May 2011 Monday Agenda Item Topics for July EC Begin Sponsor Ballot Tgaa, Tgae Requests to submit to RevCom? Nothing anticipated New project PAR to NesCom ? PAR Extension ? Study Group start up? Bruce Kraemer, Marvell

14 May 2011 doc.: IEEE /0484r0 May 2011 Monday Agenda Item Topics since March EC Plenary location picked for March 2012 was Melbourne Australia – finances defeated the plan – now scheduled for Hawaii IEEE store revamp Press releases for TGU and TGV approved Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

15 Smart Grid Meetings Monday Agenda Item 4.1.13
May 2011 doc.: IEEE /0484r0 May 2011 Monday Agenda Item Smart Grid Meetings Revision /Extension of NIST Smart Grid PAP#2. Australian Smart Metering RFI UK Consultation Update of activities in P2030 Open SG ITU Focus Group Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

16 Wednesday May 2011 May 2011 doc.: IEEE 802.11-11/0484r0
Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

17 Officer Changes Tgah Vice Chair Yongho Seok (LG Electronics)
May 2011 Officer Changes Tgah Vice Chair Yongho Seok (LG Electronics) Tgah Editor Minyoung Park (Intel) Tgah Secretary is still open. Tgad Vice Chair Vinko is stepping down as TGad vice chair.  Chris Hansen has volunteered to take his place.  Bruce Kraemer, Marvell

18 Room Changes Tgad is releasing Wed PM2 and Thurs PM2
May 2011 Room Changes Tgad is releasing Wed PM2 and Thurs PM2 S will take Wed PM2 MB will take Thur pm2 Bruce Kraemer, Marvell

19 May 2011 Bruce Kraemer, Marvell

20 May 2011 Bruce Kraemer, Marvell

21 802 Architecture - Process
May 2011 doc.: IEEE /0484r0 May 2011 Monday Agenda Item 802 Architecture - Process Jeffree will send out the letter ballot announcement to the EC WG chairs will send out the information on the ballot to their WG and/or TAG members WG and TAG chairs will collect comments by the end of the ballot period Each WG chair will arrange to have the comments consolidated into a single contribution Comments will be entered into the comment tool, reference introductory material. The WG and TAG chairs will determine their vote based on the received comments. A non-response from the WG is a recusal and does not count. Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

22 802.1 Architecture Document
May 2011 802.1 Architecture Document Bruce Kraemer, Marvell

23 802.1 Architecture Document
May 2011 802.1 Architecture Document Abstract: IEEE Std , IEEE Standard for Local and Metropolitan Area Networks: Overview and Architecture, provides an overview to the family of IEEE 802 standards. It describes the relationship of the IEEE 802 standards to the Open Systems Interconnection Basic Reference Model [ISO/IEC :1994] and explains the relationship of these standards to the higher layer protocols; it provides a standard for the structure of LAN MAC addresses; it provides a standard for identification of public, private, prototype, and standard protocols; and it defines an Object Identifier hierarchy used within IEEE 802 for uniform allocation of Object Identifiers used in IEEE 802 standards Bruce Kraemer, Marvell

24 Arch D1.2 Ballot Results Vote results: Ballot pool = 57 Yes = 7
May 2011 doc.: IEEE /0484r0 May 2011 Arch D1.2 Ballot Results supplied comments with Disapprove vote: all EC members are ex-officio members of all working groups Vote results: Ballot pool = 57 Yes = 7 No = 19 Abs = 13 Motion Fails at 27% approval Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

25 Most recent comment resolutions
May 2011 Most recent comment resolutions I have updated the comment spreadsheet to version 0.3 and I have assigned all the unresolved comments. I have also submitted it for posting to the document site. The results for assigned comments are: Gilb 136 Law 11 Das 5 Kraemer 3 Nikolich 3 Thompson 2 Mody 2 Jeffree 14 Group 1 Thaler 3 Kraemer/Thaler 1 Thompson/Jeffree 2 If you have been assigned comments, please review them to see if you are the correct person to resolve the comment. Bruce Kraemer, Marvell

26 TGU Stephen McCann Necati Canpolat Dave Stephenson
May 2011 TGU Stephen McCann Necati Canpolat Dave Stephenson Full Name: Matthew Gast Reason: Secretary and provided significant technical contribution Full Name: Eleanor Hepworth Reason: Initiated the program, provided significant technical contribution Full Name: Maximilian Riegel Reason: Driving force for the creation of the standard Full Name: Angelo Centonza Reason: Significant technical and editorial contribution Full Name: Gabor Bajko Reason: Significant technical contribution Full Name: Ronny Yongho Kim Full Name: Colin Blanchard Full Name: Hong Cheng Bruce Kraemer, Marvell

27 TGV Dorothy Stanley Pat Calhoun Emily H. Qi
May 2011 TGV Dorothy Stanley Pat Calhoun Emily H. Qi Full Name: Qi Wang Reason: Major technical contributions and review Full Name: Allan Thomson Full Name: William Marshall Reason: Reviewer and contributor Full Name: Robert Miller Reason: Working Group Secretary and contributor Full Name: Gabor Bajko Reason: Technical contributions on location Full Name: Subbu Ponnuswamy Reason: Technical Contributions on Multiple BSSID, WNM Sleep Mode, SSID List Full Name: Paul Gray Reason: MIB compilation Full Name: Fujio Watanabe Reason: Technical Contribution Full Name: Joseph Kwak Reason: Major technical contributions, MIB t Bruce Kraemer, Marvell

28 TGV cont May 2011 Reason: Major technical contributions, MIB
Full Name: Ganesh Venkatesan Reason: Major technical contributions – Timing Synchronization Full Name: Alex Ashley Reason: Major technical contributions – Multicast Diagnostics Full Name: Peter Ecclesine Reason: Major Technical Contribution Full Name: Menzo Wentink Reason: Major Technical Contribution – TIM Broadcast Full Name: Harry Worstell Reason: Major Technical Contribution – SG Chair Full Name: Moo Ryong Jeong Reason: Major Technical Contribution- QOS traffic capability Full Name: Brian Hart Reason: Major Technical Contribution- Timing Measurement Bruce Kraemer, Marvell

29 May 2011 Friday Bruce Kraemer, Marvell

30 IEEE LOA Database http://standards.ieee.org/db/patents/pat802_11.html
May 2011 Friday Agenda Item 2.02 IEEE LOA Database 18 entries with 2010 submission dates 5 entries with 2011 submission dates Bruce Kraemer, Marvell

31 Request to Remove from IEEE Shop - Nov 2010
May 2011 doc.: IEEE /0484r0 May 2011 Friday Agenda Item 2.09 Request to Remove from IEEE Shop - Nov 2010 Amendment Nov 7, 2010 Store k All drafts prior to publication Publication w U All drafts prior to D12 12.0 V All drafts prior to D15 15.0 Z j r n Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

32 IEEE SA Contents - May 2011 Friday Agenda Item 2.09 Amendment Draft in
doc.: IEEE /0484r0 May 2011 Friday Agenda Item 2.09 IEEE SA Contents - May 2011 Amendment Draft in Shop May 08 Draft in Members Area Publication in Get 802 11.2 1.01 U Yes V S 11.0 Revision 8.0 Z k, n, p, y, r, w Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

33 May 2011 Friday Agenda Item 7 Future Venues 2011 January 16-21, 2011, Hyatt Century Plaza, Los Angeles, California, USA March 13-18, 2011 Marina Bay Sands, Singapore May 8-13, 2011, Hyatt Grand Champion, Palm Springs, California, USA July 17-22, 2011 Hyatt Regency San Francisco, San Francisco, CA, USA September 18-23, 2011, Okinawa Convention Center, Okinawa, Japan November 6-11, 2011, Atlanta Regency Hyatt, Atlanta, USA Bruce Kraemer, Marvell

34 May 2011 doc.: IEEE /0484r0 May 2011 Friday Agenda Item 7 Future Venues 2012 January 15-20, Hyatt Regency, Jacksonville, FL March 11-16, 2012 – Melbourne, Australia or Big Island, HI May 13-18, 2012, Hyatt Regency Atlanta, Atlanta, Georgia, USA July 15-20, 2012    Grand Hyatt Manchester, San Diego, CA, USA September 9-14, 2012, Hilton Waikoloa Village, Waikoloa, Hawaii, USA ?? Nov 11-16, 2012    Grand Hyatt San Antonio, San Antonio, TX, USA Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

35 May 2011 May 2011 doc.: IEEE 802.11-11/0484r0 Bruce Kraemer, Marvell

36 May 2011 Bruce Kraemer, Marvell

37 Amendment Drafts in Sponsor Ballot sent to ISO since March
May 2011 Amendment Drafts in Sponsor Ballot sent to ISO since March S Revision Bruce Kraemer, Marvell


Download ppt "Supplementary Plenary Information - May 2011"

Similar presentations


Ads by Google