1 How South Eastern Railway plans to move Freight Traffic
7th June 2018

2 Features of South Eastern Railway
Division RKM Running TKM TKM (incl. Loops) No. of Stations ADRA 94 CKP 73 KGP 133 RNC 53 Total SER 353 IR 67368 93902 7349 SER (%) 4.07 4.62 4.80

3 Originating Loading of SER Loading (MT)

4 Steel Industries and SER (Figures in MT)
Year Steel Production in India Raw Materials consumed Indian Railways Loading South Eastern Railway Loading Steel Raw Material 57.16 165.76 27.16 93.01 11.02 38.66 60.62 175.80 30.93 95.98 12.3 38.37 68.62 199.00 32.3 102.17 12.36 37.41 75.70 219.53 34.86 115.92 12.43 44.91 81.68 236.87 35.29 125.23 13.43 51.5 87.68 254.27 38.55 134.17 14.66 55.69 92.16 267.26 39.97 142.55 14.63 53.29 90.98 263.84 42.47 151.68 14.83 61.67 100.74 292.15 48.41 149.42 15.52 65.05 102.02 295.86 53.18 165.81 15.9 65.43 In the last ten years, IR carried 52 % of total freight for steel industry and SER carried 39% of total Railway’s share.

5 Major Plants over SER Installed Capacity in MTPA
TATA STEEL 10 expanding up to 13 MTPA in near future. SAIL RSP : 2.2. expansion up to 4.5 MTPA under progress BSCS : 5 IISCO: 2.25 OTHERS ADHUNIK PAPK : 0.256 ADHUNIK PMAR : 0.315 TSIM : 0.425 RASHMI (PMRN) : 1.6 ELECTROSTEEL : 1.5 UMLS : 0.8

6

7 Line Capacity and Utilisation over Iron& Steel Routes
Section % Utilisation JSG-CKP-TATA JSG-ROU: 103% ROU-RKSN: 79% RKSN-SINI: 67% SINI-GMH: 47% GMH-ADTP: 93% BNDM-HTE-BKSC BNDM-HTE: 119% HTE-BKSC: 101% SINI-ANR-DMA-KPK SINI-DMA: 112% DMS-KPK: 70% DPS section-RKSN RKSN-DPS: 110% DPS-JRLI:75% DPS-BYX: 55% BXF section-BNDM BXF-BNDM: 73%

8 Quantum of Traffic expected in 2030
Exp. 2030 Steel Production (MT) 102 300 Carried by SER (MT) 15.9 46.8 Rakes per Day 15 44.2 Raw Materials (MT) 65.43 192.6 45.3 132.9 Total (MT) 81.33 239.4 Total Rakes per Day 60.3 177.1 Steel Industry will need three times more loading by the SER in To meet the demand, the line capacity works under progress in SER will be sufficient in the coming few years. Going further, capacity of SER is to be augmented in a phased manner if steel industry meets the target of 300 MT.

9 Requirement of BOXN and Special Stock for Raw Materials in 2030 (Rakes / Day)
2030 BOXN Utilisation 21 62 Holding 69 204 SPECIAL STOCK 22 65 43 127

10 Capacity Enhancement Work
TATA-CKP-ROU-JSG section: ADTP-RKSN and PST-MOU and ROU-BNDM are triple line sections. Tripling work in remaining section and quadrupling work in BNDM-ROU is under progress. RKSN-DPS section: RKSN-JNK and MLKA-DPS is triple line section. Tripling work in remaining section is under progress. BNDM-HTE-RNC-BKSC section: BNDN-HTE is single line section. Doubling is under progress. CNI-ANR-DMA-KPK section: CNI-ANR-DMA tripling work in under progress. DMA-KPK doubling work is under progress. RNC – NKM-TIS section: Automatic signalling system is under progress.

11

12 Section Capacity Improvement
Present Capacity No. of trains Capacity utilisation % Expected trains in 2030 Work in progress BXF sector BUF-BNDM 24 17.5 73 44 - RKSN-DPS 45 49 110 120 3rd line work completed except JNK-MLKA CNI-DMA 78 52 66 130 3 rd line under progress BNDM-BKSC 40 82 100 BNDM-HTE doubling in progress JSG-TATA 70 72 103

13 System Improvements in Loading and Releasing Points.
Reducing Terminal Detention will lead to increased supply of empties. Full rake siding, bulb loop, full length OHE will avoid detachment of locomotive. Standby Tipplers. Simultaneous Reception and Despatch facilities in exchange yard.

14 Terminal Detention of Steel Plants
Loading Time (hh:mm) Unloading Time (hh:mm) BOKARO 21:20 15:42 ROURKELA 26:14 10:01 BURNPUR - 09:36 TATA 16:13 09:15