Download presentation
Presentation is loading. Please wait.
1
Agile State of the Art Survey November 2010
Scott W. Ambler Copyright 2010 Scott W. Ambler
2
Copyright 2010 Scott W. Ambler www.ambysoft.com/surveys/
How To Use These Slides I have provided these slides, and the raw data behind them, so that others can use them in their own work. You may reuse all, or a part of, this slide deck as long as you provide a clear reference to the source. The suggested reference is: Results from Scott Ambler’s November 2010 Agile State of the Art Survey posted at Some slides have notes Copyright 2010 Scott W. Ambler
3
Copyright 2010 Scott W. Ambler www.ambysoft.com/surveys/
About the Survey Survey ran from October 28 to November Survey link: Sent out to several agile mailing lists, including the and Posted a message on the Agile Alliance LinkedIn discussion forum Linked to from page Data, summary, and slides downloadable from 180 respondents 19% were programmers or agile team members, 36% were managers or team lead/Scrum masters, 13% were architects/architecture owners 71% had 10+ years in IT 21% worked in orgs of 500+ IT people 55% North American, 29% European, 6% Asia Pacific Copyright 2010 Scott W. Ambler
4
Team Experience with Agile
Copyright 2010 Scott W. Ambler
5
Who Received Agile Training?
Copyright 2010 Scott W. Ambler
6
Who Received Mentoring in Agile Strategies?
Copyright 2010 Scott W. Ambler
7
Funding Strategy on Experienced Agile Teams
66% of teams provided an initial estimate/budget. Of those: 67% evolved their estimate throughout the project 51% did staged funding 66% of teams did evolutionary funding 48% of teams did staged funding 20% of teams did either evolutionary funding or staged funding, but did not provide an initial estimate Experienced teams = Pretty much agile but working out a few kinks or Mature agile team Copyright 2010 Scott W. Ambler
8
Iteration Length on Experienced Agile Teams Average = 2.3 weeks
Experienced teams = Pretty much agile but working out a few kinks or Mature agile team Average calculated as a weighted average. Variable and no iterations not included in average. 1 day or less considered as 1 day. 1 week or less considered as one week. 7+ weeks taken as 8 weeks. Copyright 2010 Scott W. Ambler
9
Copyright 2010 Scott W. Ambler www.ambysoft.com/surveys/
Transition/Release Phase on Experienced Agile Teams Average = 4.6 weeks Experienced teams = Pretty much agile but working out a few kinks or Mature agile team Average calculated as a weighted average. 1 day or less considered as 1 day. 1 week or less considered as one week weeks taken as 14 weeks. Copyright 2010 Scott W. Ambler
10
Copyright 2010 Scott W. Ambler www.ambysoft.com/surveys/
Transition/Release Frequency on Experienced Agile Teams Average = Once every 11.4 weeks Experienced teams = Pretty much agile but working out a few kinks or Mature agile team Average calculated as a weighted average. More than annually considered to be 14 months Copyright 2010 Scott W. Ambler
11
Funding Strategy on Inexperienced Agile Teams
72% of teams provided an initial estimate/budget. Of those: 62% evolved their estimate throughout the project 49% did staged funding 56% of teams did evolutionary funding 49% of teams did staged funding 12% of teams did either evolutionary funding or staged funding, but did not provide an initial estimate Inexperienced team = Just starting or adopted several techniques but not fully agile Copyright 2010 Scott W. Ambler
12
Iteration Length on Inexperienced Teams Average = 2.6 weeks
Inexperienced team = Just starting or adopted several techniques but not fully agile Average calculated as a weighted average. Variable and no iterations not included in average. 1 day or less considered as 1 day. 1 week or less considered as one week. 7+ weeks taken as 8 weeks. Copyright 2010 Scott W. Ambler
13
Copyright 2010 Scott W. Ambler www.ambysoft.com/surveys/
Transition/Release Phase on Inexperienced Agile Teams Average = 6.0 weeks Inexperienced team = Just starting or adopted several techniques but not fully agile Average calculated as a weighted average. 1 day or less considered as 1 day. 1 week or less considered as one week weeks taken as 14 weeks. Copyright 2010 Scott W. Ambler
14
Copyright 2010 Scott W. Ambler www.ambysoft.com/surveys/
Transition/Release Frequency on Inexperienced Agile Teams (Average = Once every 13.8 weeks) Experienced teams = Pretty much agile but working out a few kinks or Mature agile team Average calculated as a weighted average. More than annually considered to be 14 months Copyright 2010 Scott W. Ambler
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.