Presentation is loading. Please wait.

Presentation is loading. Please wait.

2017 Annual Recognition Awards

Similar presentations


Presentation on theme: "2017 Annual Recognition Awards"— Presentation transcript:

1 2017 Annual Recognition Awards
SF Bay Area Section 2017 Annual Recognition Awards January 18, 2018

2 Annual Recognition Awards
Twelfth Year Two Categories Nomination Period – September/October Panel Reviews/Ranks each nomination Criteria identified in the Awards Guidelines Based on Nomination Forms Winners recognized in January

3 Annual Awards Panelists Afsaneh Yavari, UC Berkeley
Hanieh Houshmandi, San Mateo County Joy Bhattacharya, Stantec Lin Zhang, TJKM Rafat Raie, City of Walnut Creek

4 Annual Awards Criteria
Professional of the Year Project of the Year Project Management Innovation Challenge Community Organization Involvement Mentorship Justification Scope Impact Innovation Challenge Uniqueness Community Benefit

5 Professional of the Year
Kimberly Leung, PE San Francisco Municipal Transportation Agency Associate Engineer in Sustainable Streets Division La Playa Pedestrian Improvement Project (2016 – present) Project Manager – initiative to improve pedestrian safety and mobility at the La Playa/Judah intersection Van Ness Corridor Transit Improvement Project (2013 – 2016) Traffic Engineer Lead – First Bus Rapid Transit project in San Francisco Central Subway Project ( ) Traffic Engineer Lead – 1.7-mile Muni light rail extension

6 Professional of the Year
Kimberly Leung, PE SF Bay Area ITE involvement since 2008 re-established ITE student chapter at UC Berkeley SF Bay Area ITE President Section recognized for quality of technical and non-technical programs 2015 ITE International Section Activities Award 2015 ITE Western District Section/Chapter Activity Award Current UC Berkeley Student Chapter Liaison Mentors Cal ITE student chapter, ASCE Cal Transportation Competition Team Active in Western District ITE and International ITE

7 Project of the Year Nominees
SR 82 and SR 84 Pedestrian Safety Improvement Project Caltrans High Intensity Activated Crosswalk (HAWK) and Pedestrian Hybrid Beacons (PHB) 14 locations, 4-6 lanes, ADT of 12,000 vehicles +, high collision rate Upgraded lighting, ADA ramps, sidewalks, signage, and crosswalks

8 Project of the Year Nominees
Redwood & Grant Transit Improvement Project Marin Transit with City of Novato and Golden Gate Bridge, Highway & Transportation District Transit hub redesign 1000 daily passenger trips Innovative contraflow design Additional service Safer pedestrian access Interconnected pedestrian signals and TSP system

9 Project of the Year Regional One-Way Car Share in the Bay Area
City of Oakland and City of Berkeley with A3Ventures/GIG Carshare First one-way car share in the Bay Area Innovative non-station based approach Sustainable mobility solutions First mile/last mile Emissions


Download ppt "2017 Annual Recognition Awards"

Similar presentations


Ads by Google