Presentation is loading. Please wait.

Presentation is loading. Please wait.

Facilities Master Plan

Similar presentations


Presentation on theme: "Facilities Master Plan"— Presentation transcript:

1 Facilities Master Plan
10-County Budget Conference Facilities Master Plan September 13, 2018

2 Facilities master plan
10-county budget conference Facilities master plan Larimer County Process Last Completed in 2006, Limited Scope Comprehensive Plan RFP – Late 2016 Capital renewal & expansion Clearly stated assumptions – Jail as priority 5-year increments with flexibility 1

3 Facilities master plan
10-county budget conference Facilities master plan Larimer County Process RFP – Late 2016 Continuity across building assessments Cost escalation Historical growth vs. projected Results in aggregate & by department Deep organizational dive – 3 levels 2

4 Facilities master plan
10-county budget conference Facilities master plan Larimer County Process Advisory Team Formed Manageable size Balanced across organization Strategic choices Scheduled Updates to Senior Staff Realistic Timeline Realistic Project Budget 3

5 Facilities master plan
10-county budget conference Facilities master plan Keys to Success Obviously, Pick the Right Team Responsive, communicative, experienced, action-oriented Not too many Sensitive to organizational dynamics 4

6 Facilities master plan
10-county budget conference Facilities master plan Keys to Success Alignment Commissioner support throughout All recognized the need Cooperative spirit Share the History – 1.83% Growth Predictability & Rhythm 5

7 Facilities master plan
10-county budget conference Facilities master plan Results $582M Across 20 Years - Daunting Frontloaded - $390M in first five years Criminal Justice – FMP definition jumpstarts design Escalation – 6% in first five years, 3% after Staffing projections slightly below 15-year history Set of options – flexible plan as desired 6

8 Facilities master plan
10-county budget conference Facilities master plan Results Momentum Financial plan to Commissioners inside a month! Thumbs up on two major priorities – Jail Expansion, Fleet Campus 7

9 Examples BLUE SPRUCE CAMPUS OCCUPANCY BLUE SPRUCE CAMPUS At 20 years:
5-Year Occupancy: All of Human Services consolidated in a new building and Public Health & Environment in remodeled existing location Extension moves to The Ranch Demolish 2nd existing building At 10 Years, potentially build new Internal Services Building (assumes a 3-story bldg.) At 20 Years the site is at full capacity BLUE SPRUCE CAMPUS 8

10 ADMIN & OPS SPACE NEEDS OVERVIEW
Examples ADMIN & OPS SPACE NEEDS OVERVIEW Current NSF 413,240 * Current Rightsized Req'd NSF 98,110 24% growth Addt'l NSF Req'd at 5 Yrs 19,790 4% growth Addt'l NSF Req'd by 20 Yrs 80,850 15% growth Total New NSF Required 611,990 48% growth ADMIN/OPS SPACE NEEDS Current Seats 1,207 Addt'l Seats Req'd at 5 Yrs 82 Addt'l Seats Req'd at 20 Yrs 405 Total New Seats Required 1,694 40% growth (Historic County 20 Yrs) 1,751 45% growth *Excluding Most CJ Functions, Solid Waste Facilities Including Probation, AIIM office, Coroner space 9

11 Examples PROPOSED 20-YEAR END GAME 20-YEAR GOAL-ADMIN/OPS MIDPOINT 10
CONSIDERATIONS As functions move to more appropriate locations (Road & Bridge/Fac. Shop to the new facility, Human Services to consolidated location, and Elections to a new Admin. Bldg), leased space can be completely vacated over 5-10 years. Remaining needs for Probation and AIIM can be accommodated in the County owned Midpoint Building with surplus space available for several possible uses. 20-YEAR GOAL-ADMIN/OPS 10

12 20 YEAR GOAL – CJ FUNCTIONS
Examples PROPOSED 20 YR END GAME Jail Remodel 20 YEAR GOAL – CJ FUNCTIONS New Construction Phase I Continued Use of Existing Bed Units, partial construction of new Support Space, (10) new housing pods (vs. 12 as previously proposed) 11

13 Examples TOTAL COUNTY MP COST ESTIMATES TOTAL COST 5 YR 10 YR 15 YR
Total County Admin/Ops $153,171,000 $45,594,000 $4,162,000 - $202,927,000 Total Criminal Justice $236,810,000 $59,581,000 $46,742,000 $35,792,000 $378,925,000 $389,981,000 $105,175,000 $50,904,000 $35,781,000 $581,852,000 TOTAL COST Costs include total project construction costs and component replacement costs, but exclude specialized equipment, site development and site acquisition Escalation is 6% annually for Yrs 0-5, and 3% annually for all remaining timeframes 12

14 Facilities master plan
10-County Budget conference Facilities master plan Thank you for your time! Questions? 13


Download ppt "Facilities Master Plan"

Similar presentations


Ads by Google