Using CM to Maintain the Design Basis
Facilitated By: Lloyd Hancock Rick Harris
2
Examples of Design Basis Requirements Miscues
Vertical Assessment – identified unacceptable time critical action Safety injection system test lines – test procedures didn’t reflect design assumptions Vendor adding a platform over vessel during refueling – not evaluated properly
3
CM Program Elements Operations & Maintenance Procedures reviewed by Engineering Questioning Attitude to catch obscure assumptions Engineering review of questionable situations Identify subtle changes to plant that modify design
4
CM Program Elements Change in initial conditions analysis assumptions
New employee orientation program should include CM Capturing tribal knowledge Transfer problem solving skills Reward questioning attitude Mentoring
5
CM Program Elements Highlighting in procedure when design requirement
Make a cross reference of links Procedure commitment database 50.59 review team with participation of Procedure writers Vertical slice self assessments
6
CM Program Elements Assumptions in DBDs Procedure commitment database
Oversight of non-station personnel Operating Experience Software programs
7
How To Assess Conformance
Vertical slice Assessments, quick hitter INPO AFIs – OE Wait until NRC catches you Operating Events Corrective Action Program for trending
8
How To Assess Conformance
Performance Indicators Surveys External Review Bring in new people – new blood