Presentation is loading. Please wait.

Presentation is loading. Please wait.

<month year> doc.: IEEE < e> <September 2018>

Similar presentations


Presentation on theme: "<month year> doc.: IEEE < e> <September 2018>"— Presentation transcript:

1 doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> doc.: IEEE < e> <September 2018> Project: IEEE P Working Group for Wireless Specialty Networks (WSNs) Submission Title: [TG4z EIR Closing Report] Date Submitted: [13 September 2018] Source: [Tim Harrington] Company [Pro-ID] Address [Los Gatos, CA] Voice:[ ], Re: [TG4z EIR Closing Report for July 2018 interim session] Abstract: [IEEE TG4z EIR Closing Report for September 2018 interim session] Purpose: [IEEE TG4z EIR Closing Report for September 2018 interim session] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Tim Harrington (Pro-ID)

2 IEEE 802.15.4z EIR Closing report
<September 2018> IEEE z EIR Closing report September Tim Harrington IEEE TG4z EIR Chair Tim Harrington (Pro-ID)

3 Jul 12, 2010 07/12/10 <September 2018> Presentations z-suggested-changes-to- include-ch-3-for-enhancing-lrp-uwb z-spectrum-sharing- and-payload-capacity z-figure-of-merit-for- hrp-uwb-data-modulations z-inclusion-of-uwb- secure-service-information-element Tim Harrington (Pro-ID) Page 3

4 Additional Presentations
<September 2018> Additional Presentations z-adaptive-preamble- length-mode-for-uwb-hrp-ranging z-eirp-considerations z-pulse-energy- considerations z-hrp-uwb-phy- enhanced-mode-consensus Kunal Shah (Silver Spring Networks)

5 Deliverables for 802.11ax CAD
<September 2018> Deliverables for ax CAD Justification for UWB current and near term forecasts – size of UWB opportunity; What are the impacts if allowed to operate (Billy’s doc) Elevator pitch Don Sturek (Itron)

6 <September 2018> TG Motions Motion to accept document z-hrp-uwb-phy-enhanced-mode-consensus based on document to extend the baseline for the HRP enhancements. Motion to include document z-inclusion-of-uwb-secure-service-information-element into the HRP Baseline draft document z to extend the baseline for the HRP enhancements. Motion to include document z-spectrum-sharing-and-payload-capacity and z-suggested-changes-to-include-ch-3-for-enhancing-lrp-uwb into the baseline LRP draft.

7 Jul 12, 2010 07/12/10 <September 2018> Timeline March 2018 – 2nd Call for proposals – resolved comments on PAR and CSD July 2018 – Review new proposals – Merge Baselines for draft September 2018 –Drafting using merged baselines November 2018 – Complete drafting - 1st letter ballot January 2019 – Comment Resolution – Recirculation ballot March 2019 – Comment Resolution – Start Sponsor ballot May 2019 – Comment Resolution – Forward to RevCom Tim Harrington (Pro-ID) Page 7

8 November Plenary Scheduled 8 sessions
Jul 12, 2010 07/12/10 <September 2018> November Plenary Scheduled 8 sessions Drafting using merged baseline for LRP and HRP Letter ballot? Tim Harrington (Pro-ID) Page 8


Download ppt "<month year> doc.: IEEE < e> <September 2018>"

Similar presentations


Ads by Google