Presentation is loading. Please wait.

Presentation is loading. Please wait.

ADMINISTRATION EXPERIENCE OF ISM CODE IMPLEMENTATION

Similar presentations


Presentation on theme: "ADMINISTRATION EXPERIENCE OF ISM CODE IMPLEMENTATION"— Presentation transcript:

1 ADMINISTRATION EXPERIENCE OF ISM CODE IMPLEMENTATION
Robin Phillips Deputy Director

2 BAHAMAS FLEET COMPOSITION BY GT

3 WE LOVE ISM ! WHY ??? IT IS PROVEN TO WORK
BASED UPON GENERAL PRINCIPLES AND OBJECTIVES IT RECOGNISES THAT ONE SIZE DOES NOT FIT ALL MANAGER DECIDES HOW TO COMPLY SMS IS SPECIFIC TO THE OPERATIONS

4 ISM IMPLEMENTED ENSURES A LINK BETWEEN COMPANY AND SHIP
PROVIDES A FRAMEWORK FOR FEEDBACK AND COOPERATION INTERNAL AUDIT IS NECESSARY

5 AUDIT REQUIREMENTS DOCUMENT OF COMPLIANCE
SAFETY MANAGEMENT CERTIFICATE EXTERNAL INTERNAL Each activity is a sampling process

6 AUDIT AND CERTIFICATION
TEN RECOGNISED ORGANISATIONS TEN VIEWS ON ISM CODE BROADLY UNIFORM UNDERSTANDING BY ALL RECOGNISED ORGANISATIONS REMARKABLY FEW CONFLICTS

7 FEEDBACK TO ADMINISTRATION
ISM IS IMPLEMENTED WITHOUT REFERENCE TO THE ADMINISTRATION IN MOST CASES PROCESS FOR CONTINUAL IMPROVEMENT AUDIT – Non Conformity or Observation – Corrective Action Plan CYCLE MINIMAL FEEDBACK

8 PAPER EXERCISE ? AUDIT NON CONFORMITY CORRECTIVE ACTION PLAN
VERIFICATION etcetera INVOLVE THE ADMINISTRATION!

9 ISM AS A TOOL FOR IMPROVEMENT BY ADMINISTRATIONS
WHY? EXCEPTIONAL CIRCUMSTANCES ARE BROUGHT TO OUR ATTENTION RO FINDINGS (MAJOR NC) PSC FINDINGS POOR MANAGER RESPONSE TO INSPECTIONS

10 POOR INSPECTION, SURVEY PLANNING
ACCIDENT OR CASUALTY INVESTIGATION HOW? ENHANCED AUDIT REGIME – SPECIFIC FOCUS INSTRUCTIONS TO RECOGNISED ORGANISATION OBSERVE AUDIT

11 ENHANCED AUDIT REGIME WHAT ARE THE RESULTS? VARIABLE!
POOR RESPONSE – CAN LEAD TO DELETION FROM THE REGISTER GOOD RESPONSE – CAN LEAD TO A PRODUCTIVE RELATIONSHIP BETWEEN ADMINISTRATION, RECOGNISED ORGANISATION AND MANAGER

12 RECOGNISED ORGANISATION PERFORMANCE
A GOOD JOB COMMUNICATE MAJOR NON CONFORMITY, REPEATED NON CONFORMITY OR CORRECTIVE ACTION PLAN REPEAT CYCLE IACS PR17

13 INFORMATION SHARING WORKING TOGETHER DEVELOP COMMON UNDERSTANDING
IMPROVE THE EFFECTIVENESS OF MANAGEMENT IMPROVE THE QUALITY OF TONNAGE

14 Supporting The ISM Code


Download ppt "ADMINISTRATION EXPERIENCE OF ISM CODE IMPLEMENTATION"

Similar presentations


Ads by Google