Discussion on the quality of the quantification reporting in the Strategic reports / AIR 2011
John Walsh Alida Staicu Evaluation and European Semester Unit - DG for Regional and Urban Policy EUROPEAN COMMISSION Brussels, March 2013
2
Headlines …. Core Indicators are being used on a pilot / voluntary basis … a practice run for ! Not all OPs report when they could … underreporting of 20% - 50% ! no coherence with the project selection data (MS allocating money but not reporting against the relevant core indicators); data reported for one OP only, missing the figures for other OPs using the same indicator; reported data for the ERDF only, CF figures not included. Lack of (plausibility) checks of what is input significant differences between the SR and AIR data for same period (SR data lower in most of cases, in some SR additional indicators used)
3
Use of Indicators … Part 1
Inconsistent reporting / use linked to Different national / regional definitions / practices in relation to indicators i.e. jobs Lack of consistency in related indicators – ie jobs created total … and the relationship with Jobs created in SMEs Research Jobs
4
Use of Indicators … Part 2
Inconsistent reporting / use linked to Inconsistent measurement units – i.e. energy (MWh or KW used instead of MW), transport time savings, Reporting Contracted vs achieved outputs / results "Problems" with target setting … no targets, too high or too low targets …
5
Example … Renewable energy
What is it comparing? share of total all EU financing allocated to projects by end 2011 Share of reported MW of generation capacity completed (excludes project under way … so preliminary picture). What does it say? Many that are investing have not reported core indicator achievements strong assymetries between volumes allocated and added capacity
6
Example … Gross job creation
What is it comparing? share of total all EU financing – Share of reported jobs created (normally excludes jobs safeguarded, temporary jobs and project under way … so a preliminary picture). What does it say? Some important beneficiaries have reported very low or zero jobs created … There are strong assymetries between volumes allocated and jobs created … only partly explainable by reporting lags or differences in the composition of programmes (i.e. ration of business support vs infrastructure)
7
Conclusions Big improvements since 2010 Exercise, but
"Much needs to be done" … starting now for 2012 Annual reports …..
8
Thank you for your attention!