Presentation is loading. Please wait.

Presentation is loading. Please wait.

Welcome and Introduction

Similar presentations


Presentation on theme: "Welcome and Introduction"— Presentation transcript:

1 Welcome and Introduction
Carol Johnson NIST

2 MOBY Personnel in Attendance
Carol Johnson - NIST Dennis Clark - NIST Ken Voss - University of Miami Steve Brown - NIST Mark Yarbrough - Moss Landing Stephanie Flora - Moss Landing

3 Schedule, Day One Tuesday July 18th
8:00 AM Arrival at NIST and check-in at gate 8:30 AM Welcome and meeting objectives (C. Davis and C. Johnson) 8:45 AM NOAA prospective and goals for meeting (S. Wilson and K. Hughes) 9:00 AM MOBY background and need for replacement (D. Clark) 9:30 AM RNO Concept: design and implementation (D. Clark) 10:00 AM Coffee Break 10:30 AM Description of AHAB design Physical Structure (30 mins) (M. Yarbrough) Optical Design (30 mins) (S. Brown) 11:30 AM Plan to complete and test re-engineered system (S. Brown) 12:00 PM Lunch 1:00 PM Plan for calibration and maintenance of AHAB Uncertainty budgets: Laboratory (C. Johnson) Environmental (K. Voss) 2:00 PM AHAB Deployment plan (timeline) (M. Yarbrough) 2:30 PM Summary (C. Johnson) 3:00 PM Afternoon Break 3:30 PM Group Discussion of goals and presentation (C. Davis and K. Hughes) and development of and initial outline of report 4:00 PM Review team and NOAA representatives meet in closed session 4:45 PM Depart for Hotel

4 Schedule, Day Two Wednesday July 19th
8:00 AM Arrival at NIST and check-in at gate 8:30 AM Review team reports their initial findings and outline of the report 9:00 AM Discussions with the MOBY Team 10:00 AM Coffee Break 10:30 AM Review Team and NOAA meeting in closed session to update report outline 11:30 AM Reconvene for discussion with the MOBY team and develop schedule for completion of the report 12:00 PM Lunch 1:00 PM Review Team works on first draft of the report 3:00 PM Afternoon Break 4:00 PM Adjourn

5 MOBY Meeting Objectives
MOBY Background Review of the Research and Operations (R&O) progress FY05 and FY06 funding Describe goals based on R&O funding Show accomplishments Describe our vision of the future Learn from the 9 year MOBY experience Incorporate R&O lessons Solution: New instrument build ROSES funding requested for build Plan MOBY decommission and operation use of new instrument beginning in FY10


Download ppt "Welcome and Introduction"

Similar presentations


Ads by Google