1 FIA Implementation 2005: Status and Prospects
Sue Willits Program Manager PNW-FIA 2005 PNW Regional Strategy Group

2 FY 2004 End of Year Status (National):
Approximately 76% of country covered (44 states) with 85% of funding 160 reports & publications Released V 2.0 of the National Field Guide

3 Annual FIA Fieldwork Status, 2004

4 Availability of State FIA Data, November 2004
Age of the most recent data available to the public in online FIA databases.

5 FY 2004 End of Year Status (National):
Tested and presented the utility of approximate coordinates for mill studies and biomass. The results demonstrated the utility of the publicly available coordinates to deliver valid analysis. Implement a final protocol for vegetative diversity as a final test where funding permits. Core FIA data loaded into FSVeg.

6 FY 2004 End of Year Status (National):
Involved in numerous cooperative projects: Fire risk and treatment opportunity analysis. Insect and disease risk mapping. National land cover mapping. National, regional assessments. Applications of NASA technology.

7 FIA Funding 2004-2005 ($ millions)
R&D: $52.0 $55.9 FRIA $ 5.0 TOTAL $57.0 $60.9 TARGET: $68.9 $71.0

8 FY 2005 Status (PNW): 61 % of Region implemented
Coastal Alaska, California, Oregon, Washington, FSM 80 % Funded ($3 million increase in FY06) Consistent field manual for AK, CA, OR, WA Extensive QA of NIMS compilation process & review by States.

9 PNW-FIA FY 04 goals FINISHED: Include P3 Veg in WA & AK
Load Regional data into NRIS Review volume equations & standardize Publish State Reports (OR, Guam, A. Samoa) Publish CA Oak Woodlands, SOD, CA Forest Products Industry

10 PNW Goals for FY 04/05 Started/In Progress:
Increase efficiency of inventory – Lidar, etc. Continue Riparian pilot work w/ ODOF OR Mill Survey Conduct Utilization Studies Make BioSum into user tool

11 PNW Goals FY 05 Delivery of inventory data 6 months after field season
Set up work for Oregon 5-year Report Continued delivery of periodic reports – Washington, CNMI GNN Mapping for Oregon

12 Conclusion – National Picture
On course to full implementation. Have addressed all Farm Bill criteria. Strategic Planning for next 5 years

13 Conclusion – Regional Picture
Steady Progress towards full implementation Interior Ak Pacific Islands Consistency among PNW states – variables collected and compiled Continued progress in making data available Continued emphasis on analysis & reporting