Presentation is loading. Please wait.

Presentation is loading. Please wait.

Burkina Faso 1) SECTOR: DRR (Flood forecast)

Similar presentations


Presentation on theme: "Burkina Faso 1) SECTOR: DRR (Flood forecast)"— Presentation transcript:

1 Burkina Faso 1) SECTOR: DRR (Flood forecast)
Current: Daily, 7-days 10-days forecasting for rainfall and temperature. Time scale: Sub-seasonal. Type: extreme rainfall [drought and heat waves (dry season April-May)] Gaps: poor accuracy for rainfall, Dissemination/No Early Warning system, No SOP 2) POTENTIAL PARTNERS: CONASUR, SP/CONEDD, Medias, Telephone Companies, Civil Protection Dept 3) REQUIREMENTS from RCC : 1- Available GPCs (ECMWF ,…) MME 2- Data Rescue 3- Analysis historical data 4) REQUIREMENTS FOR OTHER ENTITIES: GPCs data access, Training on the access and use of their products 5) REQUIREMENTS FOR TOOLS: GPC forecast maps and data - 6) Work Plan 1-2 Month: Discussion design of activities 2-5 Month: Analysis of historical, Thresholds 5-8 Month: Procedures and Method of use of GPC products, skills assessment : : implementation of forecasting SOP definition (Consult with other partners, …)

2 Drought monitoring Calculate indices from the stations Indices for some of the datasets used to validate CORDEX models

3 Sector: DRR/Flooding Forecast: 5-7days


Download ppt "Burkina Faso 1) SECTOR: DRR (Flood forecast)"

Similar presentations


Ads by Google