Presentation is loading. Please wait.

Presentation is loading. Please wait.

Re-designing the value and supply chain of water and minerals

Similar presentations


Presentation on theme: "Re-designing the value and supply chain of water and minerals"— Presentation transcript:

1 Re-designing the value and supply chain of water and minerals
A circular economy approach for the recovery of resources from saline impaired effluent (brine) generated by process industries Budget H2020: € M Total budget: € 11.3 M Project: Zero Brine Duration: June 2016 – May 2021 Project Coordination: TU Delft, Prof. Henri Spanjers ZERO BRINE advances innovative solutions to address global water challenges by recovering resources Objective This project aims to facilitate the implementation of the Circular Economy package and the SPIRE Roadmap in various process industries by developing the necessary concepts, technological solutions and business models to re-design the value and supply chains of minerals (including magnesium) and water, while dealing with present organic compounds in a way that allows their subsequent recovery. Scope New configurations to recover these resources from saline impaired effluents (brines) generated by process industry, while eliminating wastewater discharge and minimising environmental impact of industrial operations through brines (ZERO BRINE) will be demonstrated. The project will bring together and integrate several existing and innovative technologies aiming to recover end-products of high quality and sufficient purity with good market value. It will be carried out by large Process Industries, SMEs with disruptive technologies and a Brine Consortium of technology suppliers across EU, while world-class research centres ensure strong scientific capacity and inter-disciplinary coordination to account for social, economic and environmental considerations, including LCA. Solution A large scale demonstration will be developed in the Energy Port and Petrochemical cluster of Rotterdam Port, involving local large industries. Two demo plants will be able to treat part of the brine effluents generated by one process industry (EVIDES), while the waste heat will be sourced by neighbouring factories. The quality of the recovered end-products will be aimed to meet local market specifications. The involvement of representatives covering the whole supply chain will provide an excellent opportunity to showcase Circular Economy in Rotterdam Port, at large scale. Finally, three large-scale pilot plants will be developed in other process industries, providing the potential for immediate replication and uptake of the project results after its successful completion. # ZeroBrine @brine_zero


Download ppt "Re-designing the value and supply chain of water and minerals"

Similar presentations


Ads by Google