Presentation is loading. Please wait.

Presentation is loading. Please wait.

March 9, 2017 Technology committee.

Similar presentations


Presentation on theme: "March 9, 2017 Technology committee."— Presentation transcript:

1 March 9, 2017 Technology committee

2 ACCESSIBILITY AT OHLONE

3 ICT ACCESSIBILITY

4 WORKSHOPS THROUGHOUT SPRING SEMESTER
EVERY TUESDAYS March 14 (Room 7104) March 21 (Room 7102) March 28 (Room 7104) April 11 (Room 7107) April 18 (Room 7102) April 25 (Room 7102) May 2 (Room 7102) May 9 (Room 7102) EVERY WEDNESDAYS March 15 (Room NC 1118) March 29 (Room NC 1118) April 5 (Room NC 1118) April 19 (Room NC 1118) May 3 (Room NC 1118) EVERY THURSDAYS March 9 (Room 7107) March 16 (Room 7104) March 23, 30 (Room 7102) April 13 (Room 7102) April 20 (Room 7104) April 27 (Room 7102) May 4, 11 (Room 7102) From 2 pm to 2:30 pm

5 TRAINING PLAN - UPDATES

6 2017-2018 TECHNOLOGY TRAINING PLAN
SUB COMMITTEE MEMBERS Jeff O’Connell Lynn Hickson Margaret Lee Kyle Livie Ron Sha Tracy Virgil Chris Dela Rosa

7 TMP – ACTION ITEMS

8 2017-2018 ACTION ITEMS – TECH MASTER PLAN (1)
INSTRUCTIONAL TECHNOLOGY 1 Academic Core Building – Large Lecture Hall INSTITUTIONAL TECHNOLOGY 2 Digital Signage Professional Development Database Electronic Personnel Action Form Intranet/Portal Student Educational Planning Software

9 2017-2018 ACTION ITEMS – TECH MASTER PLAN (2)
TECHNOLOGY INFRASTRUCTURE 3 Student – Microsoft Office 365 Cloud-based Authentication of all systems Computer Replacement Plan Colleague Web Time Entry Colleague Database Migration Phase II Telephone System Upgrade (VOIP) Wireless Network Upgrade (Fremont and Newark) INFORMATION SECURITY 4 Identity Management and Single Sign On

10 VIRTUAL DESKTOP – HYMAN HALL

11 VDI – HYMAN HALL IMPLEMENTATION (1)
Benefits Improved Student experience. VDI improves performance. Extended Student Services. Applications available outside of the classroom. Improved maintenance and uptime, less staffing requirements, ease of software deployment, standardization of software, and availability of virtual applications. Extends the life cycle of usable computer systems.

12 VDI – HYMAN HALL IMPLEMENTATION (2)
Technology Master Plan VDI is part of the Action Items under the TMP - implement a pilot virtual desktop infrastructure at Hyman Hall. Implementation Fall Semester 2017

13 NETWORK UPGRADE – CORE SWITCH

14 NETWORK UPGRADE – CORE SWITCH (1)
Benefits Core network support for all TMP objectives. Future support of high network demands such as: expanding wireless connectivity, Voice over IP, Video Surveillance, new emerging connectivity needs. Support for the new academic core buildings. Increased security and monitoring.

15 NETWORK UPGRADE – CORE SWITCH (2)
Technology Master Plan Network equipment upgrade is part of the Action Items under the TMP – replace end of life network equipment. Implementation Summer 2017

16 EARLY ALERT SOFTWARE - STARFISH

17 EARLY ALERT SYSTEM – STARFISH (1)
Background Introduced to Tech Committee in Aug 2016 Student Success and Support Program (SSSP) funded. Adopted by California Community College Technology Center Goals Identify students that need attention – at risk Communication provided timely to students Manage issues to resolution in a timely fashion

18 EARLY ALERT SYSTEM – STARFISH (2)
Key Features Colleague and Canvas Integration Automatic and Manual Flags Kudos Role and Relationship-based Access Central, Secure Student Folders Communication Workflow Case Management Dynamic Reporting

19 EARLY ALERT SYSTEM – STARFISH (3)
Key Information Pilot started on Feb. 23 Includes 22 sections (11 faculty members) Project Sponsor – Wayne Takakuwa Tijan White – Functional administrator Jennifer Harper – Lead counselor

20 EARLY ALERT SYSTEM – STARFISH (4)

21 ACB – LARGE LECTURE HALL

22 ACB – LARGE LECTURE HALL (1)
Assumptions Will be in operation by Summer 2018 Will offer state-of-the-art instructional technology What we have done so far… Met with user groups and Dr. Stagnaro Visited a showroom in San Jose with the videowall demo Working with the construction team to have the infrastructure in place to support the vision

23 ACB – LARGE LECTURE HALL (2)

24 ACB – LARGE LECTURE HALL (3)


Download ppt "March 9, 2017 Technology committee."

Similar presentations


Ads by Google