Presentation is loading. Please wait.

Presentation is loading. Please wait.

Lecture 5 – Integration of Network Flow Programming Models

Similar presentations


Presentation on theme: "Lecture 5 – Integration of Network Flow Programming Models"— Presentation transcript:

1 Lecture 5 – Integration of Network Flow Programming Models
Topics Min-cost flow problem (general model) Mathematical formulation and problem characteristics Pure vs. generalized networks 8/14/04 J. Bard and J. W. Barnes Operations Research Models and Methods Copyright All rights reserved

2 Example: Distribution problem
Min-Cost Flow Problem Example: Distribution problem Warehouses store a particular commodity in Phoenix, Austin and Gainesville. Customers - Chicago, LA, Dallas, Atlanta, & New York Supply [ si ] at each warehouse i Demand [ dj ] of each customer j Shipping links depicted by arcs, flow on each arc is limited to 200 units. Dallas and Atlanta - transshipment hubs Per unit transportation cost (cij ) for each arc Problem: Determine optimal shipping plan that minimizes transportation costs

3 Distribution Problem 2 6 1 3 4 5 8 7 [supply / demand]
arc lower bounds = 0 (shipping cost) arc upper bounds = 200 [700] [–200] (6) CHIC 2 NY 6 [–250] PHOE 1 (4) (7) (6) (4) (3) (3) (5) (5) (2) [–200] LA 3 DAL 4 ATL 5 [–150] (7) (2) [–300] (4) (2) (7) (6) (5) GAINS 8 [200] AUS 7 [200]

4 Notation for Min-Cost Flow Problem
In general: [supply/demand] on nodes (shipping cost per unit) on arcs In example: all arcs have an upper bound of 200 nodes labeled with a number 1,...,8 Must indicate notation that is included in model: (cij) for costs (uij) for capacities/simple upper bounds (gij) for gains All 3 could be included: (cij, uij, gij)

5 Spreadsheet Input Data
arc name origin node termination node lower bound upper bound cost gain xij i j lij uij cij gij i j external flow si or -di The origin node is the arc’s tail The termination node is called the head Supplies are positive and demands are negative

6 Data Entry Using Math Programming/Network Add-in.
And here is the solution ...

7 Solution to Distribution Problem
[supply / demand] (flow) [-200] [-250] (200) [700] CHIC NY PHOE (50) (100) (200) (200) [-150] LA ATL (200) [-300] DAL (50) [-200] (200) [200] GAINS AUS [200]

8 Sensitivity Report for Max Flow Problem

9 Characteristics of Network Flow Problems
Conservation of flow at nodes. At each node flow in = flow out. At supply nodes there is an external inflow (positive) At demand nodes there is an external outflow (negative). Flows on arcs must obey the arc’s bounds. lower bound & upper bound (capacity) Each arc has a per unit cost & the goal is to minimize total cost.

10 Distribution Network  Notation [external flow] (cost)
lower = 0, upper = 200 [-200] [-250] (6) 2 6 [700] 1 (4) (6) (7) (4) (5) (3) (3) (7) (2) (5) [-200] 4 [-150] 3 5 [-300] (2) (4) (6) (7) (2) (5) 8 [200] 7 [200]  Notation

11 LP for Distribution Problem
Pure network  flow at each node is conserved  flow across an arc is conserved  no gains or losses can occur on arcs Min 6x + 3x + 3x + 7x + + 4x + 7x 12 13 14 16 85 86 s.t. -x - x - x = - 200 Flow balance constraints for each of the 8 nodes sit. - x + x - x = - 12 200 21 42 41 52 51 x + x + x x = x + x + + x + x = 700 12 21 13 23 14 24 15 26 -x + x - x = - 200 - x + x - x = - 43 73 200 13 23 43 63 + x + x + x + x - -x x - x - x = - 300 x + 42 x + 43 x + x + x + x + x + x = - 300 41 41 43 46 45 47 46 54 24 54 74 84 64 84 . . . x + x + x = 200 84 85 86 0 £ xij £ 200, for all (i,j ) combinations which are arcs

12 (or in the other order if i > j)
Decision variables are the flow variables xij i j By examining the flow balance constraints we see that xij appears in exactly two of them: xij . . . +1 node i (or in the other order if i > j) . . . - 1 node j . . .

13 Observations from LP Model
If we add the constraints we obtain zero on the left-hand side so the right-hand side must also be zero for feasibility. In particular, this means sum of supplies = sum of demands. Mathematically, we have one redundant constraint. Must be careful in interpreting shadow prices on the flow balance constraints. Cannot change only a supply or demand and have model make sense.

14 Pure Minimum Cost Flow Problem
G = (N, A)  network with node set N and arc set A Indices i, j Î N denote nodes and (i, j) Î A denote arcs Originating set of arcs for node i (tails are i) is the forward star of i FS(i) = { (i,j ) : (i,j ) Î A } Terminating set of arcs for node i is the reverse star of i RS(i) = { (j,i ) : (j,i ) Î A }.

15 å xij – å xji = bi In our example:
FS(1) = { (1,2), (1,3), (1,4), (1, 5) } RS(1) = Ø FS(4) = { (4,2), (4,3), (4,5), (4,6) } RS(4) = { (1,4), (5, 4), (7,4), (8,4) } å xij – å xji = bi (i,j )ÎFS(i ) where bi is positive for supply and negative for demand at node i. (j,i )ÎRS(i ) Flow Balance equation:

16 Pure Min-Cost Flow Problem
Indices/sets i, j Î N nodes arcs forward star of i reverse star of i (i, j ) Î A FS(i ) RS(i ) Data cij unit cost of flow on (i,j ) lower bound on flow (i,j ) upper bound on flow (i,j ) external flow at node i lij uij bi

17 å cijxij å xij - å xji = bi, " i Î N Decision Variables
xij = flow on arc (i,j ) Formulation Min å cijxij (i,j)ÎA s.t. å xij å xji = bi, " i Î N (i,j )ÎFS(i ) (j,i )ÎRS(i ) lij £ xij £ uij, " (i,j ) Î A

18 Generalized Minimum Cost Network Flow Model
Only one modification to “pure” formulation  a possible gain on each arc, denoted by gij If gij = 0.95 then 100 units of flow leaves node i and 95 units arrive at node j

19 Generalized Formulation
å cijxij Min (i,j )ÎA s.t. å xij å gjixji = bi, " i Î N (i,j )ÎFS(i ) (j,i )ÎRS(i ) lij £ xij £ uij, " (i,j )ÎA Note that if gij =1 " (i,j ) Î A, then we obtain the “pure” model

20 Gains and Losses Might experience 5% spoilage of a perishable good during transportation on a particular arc. gij = 0.95 for the associated arc (i,j). In production of manufacturing formulations we might incur losses due to production defects. In financial examples we can have gains due to currency exchange or gains due to returns on investments. US $ Swiss francs Year 1 Year 2 currency exchange 15% return on investment Gain = 1.78 Gain = 1.15

21 Pure Network Problems vs. General Network Problems
If bi, lij and uij are integer-valued then all extreme points of the feasible region for a pure network flow problem give integer values for xij. FACT (Same cannot be said for generalized network models.) This integer property means that if we use the simplex method to solve a pure network flow problem then we are guaranteed that xij will be integer at optimality.

22 This is critical when we formulate the assignment, shortest path problems, and other network problems. Special cases of the pure min-cost flow model: Transportation problem Assignment problem Shortest path problem Maximum flow problem

23 Checking for Arbitrage Opportunities
US $ Yen(100) CHF D-Mark Brit £ 1 US $ 1 1.05 1.45 1.72 .68 2 Yen(100) .95 1 1.41 1.64 .64 3 CHF .69 .71 1 1.14 .48 4 D-Mark .58 .61 0.88 1 .39 5 Brit £ 1.50 1.56 2.08 2.08 1 The table is to be read as follows: The 1.45 in row 1 column 3 means that $1 US will purchase 1.45 Swiss Francs (CHF). In addition, there is a 1% fee that is charged on each exchange.

24 Arbitrage Network: Generalized Min-Cost
Flow Problem Arc costs: cij = $ equivalent (first column of table) For example: c14 = 1, c35 = 0.69 [-1] US $ 1 Yen 2 5 Brit £ 4 3 D-Mark CHF Each arc has a gain of gij. For example, g12 = (1.05)(0.99) g51 = (1.50)(0.99)

25 Solution to Arbitrage Network
US $ Arc gains in optimal cycle: 1 0.674 g54 = 2.535 g43 = 0.871 g35 = 0.475 Brit £ 5 30.473 13.801 CHF 3 Total cycle gain: = = 4.88% 4 34.986 D-Mark Note (£  $): g51 = 1.485 Start with £  D-Mark  CHF  £ Remove £  $1 leaving £


Download ppt "Lecture 5 – Integration of Network Flow Programming Models"

Similar presentations


Ads by Google