Presentation is loading. Please wait.

Presentation is loading. Please wait.

TAB Internal Report to board May 2010 final

Similar presentations


Presentation on theme: "TAB Internal Report to board May 2010 final"— Presentation transcript:

1 TAB Internal Report to board May 2010 final
TAB Internal Report to board May 2010 final Martin Chapman Jacques Durand Patrick Durusau Mary McRae 1

2 Guidelines Conformance, Interoperability and Portability Testing: Procedures and Practices Puts the following TAB approved docs into context Conformance guidelines, Interop guidelines, and Testing guidelines Potential to consider process changes esp wrt Liaison Policy and more robust testing/interops.

3 Guidelines(2) Citation Best Practices Guidelines Initial draft
open.org/tab/LinkID2#preview

4 Investigation Work Standards Referencing (Ongoing)
Progress suffered as result of Mojave time sink

5 Consulting TC Process Mojave Project
Continued participation in Board Process SC Mojave Project Weekly meetings with Staff Involved in PM interview and hiring process Help in organising and developing requirements and use cases – just started refactoring Communication has improved as a result of the PM hire

6 Community Service: reviews submitted
Production Planning and Scheduling: PPS-Core-Elements-1.0 PPS-Transaction-Message-1.0 PPS-Profile-Specifications-1.0 Telecom SOA Requirements 1.0 ODF Interoperability ODF Version 1.2, Part 1 SAML 2.0 Identity Assurance Profiles v1.0

7 TAB Internal Logistics
Meeting every two weeks Minutes published on TAB Wiki

8 Conclusion Mojave has been a major time sink for TAB Internal members
We believe Mojave is a good use of our time Expect more focused use of our time now PM is in place We are producing more material than previous years.


Download ppt "TAB Internal Report to board May 2010 final"

Similar presentations


Ads by Google