Presentation is loading. Please wait.

Presentation is loading. Please wait.

HBr V(m+7) H+: Bandwidths https://notendur.hi.is/agust/rannsoknir/rempi/hbr/Jan12/PPT-200212ak.ppt https://notendur.hi.is/agust/rannsoknir/rempi/hbr/Jan12/XLS-200212aka.xls.

Similar presentations


Presentation on theme: "HBr V(m+7) H+: Bandwidths https://notendur.hi.is/agust/rannsoknir/rempi/hbr/Jan12/PPT-200212ak.ppt https://notendur.hi.is/agust/rannsoknir/rempi/hbr/Jan12/XLS-200212aka.xls."— Presentation transcript:

1 HBr V(m+7) H+: Bandwidths

2

3 Old fit by Long which was not very good

4 I can not find this one Bw Bw Bw Bw Bw Bw Bw 6 7.80613 0.7 17.4721

5 Not convincing fit Reasonable fit

6 Is this fit based on the Full J´=6 peak’ Bad fit in this region GOOD overall visual fit

7 Bw Bw Bw Bw Bw Bw Bw 6 0.7

8 This one looks the best to me
Bw Bw Bw Bw Bw Bw Bw 6 0.7

9 Based on the above figures and fits I suggest we use
BW(J´=6) = 11 +/- 3 Use average value from all experiments 1 2 3 4 5 Not included 6 Value based on above, ca. 11 +/- 3 7 Average value for exp. Other than “old value from Long 8 9 All in all:

10 stdev J´ <BW> error 3.139257 0.635296 1 3.228763 0.547863 2
1 2 3 4 5 6 11 7 8 9


Download ppt "HBr V(m+7) H+: Bandwidths https://notendur.hi.is/agust/rannsoknir/rempi/hbr/Jan12/PPT-200212ak.ppt https://notendur.hi.is/agust/rannsoknir/rempi/hbr/Jan12/XLS-200212aka.xls."

Similar presentations


Ads by Google