Surface Power – PDR John Dankanich (2-13-01)
Dispersion Fueled 100 kWe Reactor
2
Assumed 500 M from Routine Activity
System Dimensions Assumed 500 M from Routine Activity
3
Total Mass is Approximately 3,000 Kg.
Mass Breakdown Total Mass is Approximately 3,000 Kg.
4
Cost Analysis Cost of Complete System: $750 Million • Production
• Development • Production • Testing Each additional unit $250 Million • High Cost due to testing
5
Risk Assessment Radiation: Over 500m Distance for routine crew activity Radiation below acceptable occupational dosage Failure: Single Failure Modes are Difficult to Eliminate History - 3 Nuclear Incidents in 19 US missions Transit-5BN-3, Nimbus, Apollo 13 Snap-10A Reactor Failure Terrestrial Plant 1/17000 Reactor Years
6
Comparisons Existing Space Power • Heavier, Lower Shielding
Terrestrial • Lighter, Smaller, Passive DRM • Lighter, Lower Power Dr. Zubrin • Comparable Mass, Comparable Power
7
Bottom Line • Cost of $750 Million ($250 Million per additional unit)
• Reliability of 0.95 (0.98 after prototype) • Power Output 100 kWe (115 capable) • Lifetime of 5 years (7 max) • Mass of 3 Tonnes • Footprint of 13 m2