Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGn Opening Report – September ‘06

Similar presentations


Presentation on theme: "TGn Opening Report – September ‘06"— Presentation transcript:

1 TGn Opening Report – September ‘06
doc.: IEEE /1132r3 September 2006 TGn Opening Report – September ‘06 Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Name Company Address Phone Bruce Kraemer Marvell +1 - 321 4 27 4098 marvell .com Garth Hillman AMD 5402 East Ben White, Austin TX 78741 +1 (512) 602 7869 Sheung Li Atheros 529 Almanor Ave, Sunnyvale, CA 94085 +1 (408) 773 5295 Adrian STEPHENS Intel Corporation 15 JJ Thompson Avenue, Cambridge, CB3 0FD, UK +1 (503) 616 3800 om 5488 Marvell Lane, Santa Clara, CA, 95054 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

2 This Report 11-06-1132 r1 September 2006 September 2006
doc.: IEEE /1132r3 September 2006 This Report r1 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

3 September 2006 Bruce Kraemer, Marvell

4 Inappropriate Topics for IEEE WG Meetings
September 2006 doc.: IEEE /1132r3 Inappropriate Topics for IEEE WG Meetings September 2006 Don’t discuss the validity/essentiality of patents/patent claims Don’t discuss the cost of specific patent use Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions, or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at Approved by IEEE-SA Standards Board – March 2003 (Revised January 2006) Bruce Kraemer, Marvell Bruce Kraemer, Marvell

5 Attendance, Voting & Document Status
September 2006 Attendance, Voting & Document Status Make sure your badges are correct Questions on Voting status, Ballot pool, Access to Reflector or member’s area see Harry Worstell – If you plan to make a submission be sure it does not contain company logos or advertising Bruce Kraemer, Marvell

6 Attendance http://newton Register Indicate attendance September 2006
Bruce Kraemer, Marvell

7 September 2006 Clock Time Bruce Kraemer, Marvell

8 TGn Quick Review of Events prior to this meeting
September 2006 TGn Quick Review of Events prior to this meeting Bruce Kraemer, Marvell

9 September 2006 doc.: IEEE /1132r3 September 2006 One Page History of TGn HTSG formed – First meeting (Sep-11-’02 Monterey) TGn formed – First meeting (Sep-15-’03 Singapore) Began call for proposals (May 17 ’04 Garden Grove) 32 First round presentations (Sep 13 ’04 Berlin) Down selected to one proposal (Mar ’05 Atlanta) –first confirm vote failed Confirmation vote #2 failed - reset to 3 proposals -left the May ‘05 meeting with a serious deadlock. (Cairns) 3 proposal groups agreed to a joint proposal activity (Jul ’05 San Francisco) JP proposal accepted by vote of 184/0/4, editor instructed to create draft (Jan ’06 Waikoloa) Baseline specification converted into Draft 1.0. Letter ballot issued (LB84) March ’06 (Denver) and closed on April 29 (failed) Draft 1.0 Comment resolution begins (May ’06 Jacksonville) Approved 6711 editorial and 1041 technical resolutions; Created Draft (Jul ’06 San Diego) Bruce Kraemer, Marvell Bruce Kraemer, Marvell

10 11n - Overall timeline September 2006 HT SG Formed PAR Approved TGn
2002 2003 2004 2005 2006 2007 2008 HT SG Formed PAR Approved TGn Formed Publication REVCOM Approval First Sponsor Letter Ballot Selection Process & Criteria 2nd WG Letter Ballot Call for Proposals 1st WG Letter Ballot Proposal Presentations Confirmation Down Select Joint proposal Bruce Kraemer, Marvell

11 Comment Resolution Events
September 2006 Comment Resolution Events Weekly teleconferences Ad hoc – Melbourne, AU Sep ‘06 Interim – Melbourne Sep ‘06 Ad hoc – West coast Oct 17 – 19 ‘06 Ad hoc – Dallas Nov 8-10 ‘06 Plenary – Dallas Nov ‘06 Interim – London Jan ‘07 Goal = release of Letter Ballot 2.0 Bruce Kraemer, Marvell

12 TGn Ad Hoc Organization
September 2006 TGn Ad Hoc Organization Ad Hoc Topic Ad hoc leader PSMP Naveen Kakani CA Doc Sheung Li Frame Format Peter Loc PHY Jim Petranovich MAC Matt Fischer Coexistence Don Schultz Beamforming & Adaptation John Ketchum Joonsuk Kim General Jon Rosdahl Editorial Adrian Stephens Bruce Kraemer, Marvell

13 Ad Hoc Output Document Summary
September 2006 Ad Hoc Output Document Summary Ad Hoc Topic .xls resolution file # Revision as of Sep 17 8 am Beamforming & Adaptation 675 35 PSMP 687 29 General 688 31 MAC 690 33 PHY 693 38 Editorial 706 14 Frame Format 717 34 Coexistence 724 22 CA Doc 731 04 Bruce Kraemer, Marvell

14 802.11 Draft Revision Procedure
September 2006 Draft Revision Procedure Editor prepares revision Chair reviews and uploads 1 page submission on 802wirelesworld public server indicating new document exists in the private server draft area. Harry receives draft and posts in members area Server area will differentiate approved from un-approved versions Bruce Kraemer, Marvell

15 Draft Revision History
September 2006 Draft Revision History Black = actual past events, Blue = expected future events Draft Approved by WG for letter ballot (LB84) Draft Working draft –contains proposed editorials Draft Contains editorials only - P TGn (July ‘06) Draft Working draft -Contains July technical resolutions Draft Contains July technicals - P TGn (Sep ‘06) Draft Working draft -Contains Sep technical resolutions Draft Contains Sep technicals - P TGn (Nov ‘06) Bruce Kraemer, Marvell

16 Letter Ballot #1 Comments
September 2006 Letter Ballot #1 Comments 12400 Editorial & Technical Unique Duplicate 6400 6000 Editorial Technical 3276 3124 Bruce Kraemer, Marvell

17 Comment Allocation Technical 3124 September 2006
Bruce Kraemer, Marvell

18 Comment Allocation 3124 Technical Approved in July Done Motion tabs
September 2006 Comment Allocation 3124 Technical Approved in July Done Motion tabs ready Done Pending 467 499 1117 1041 (= recycled) Bruce Kraemer, Marvell

19 TGn Minutes of July ’06 06/0968r1 September 2006
Executive Summary (also see Chairs’ meeting doc r5 and closing report doc r0): Session focused on Comment Resolution; the number of comment resolutions accepted in 34 motions by the respective ad hocs were: General – = 205 Editorial – 6711 Phy – = 143 MAC – 353 Frame Format – = 115 Coexistence – = 129 PSMP – 16 Beam forming and Link Adaptation – = 123 For a total of 7795 comments resolved (49% of technical)! The numbers indicate the number of comments in particular motions wrt that ad hoc as taken from the minutes. Draft approved for this session was D1.02 Important straw polls taken: Shall we make processing GF preamble mandatory (for-48, against 78, abstain 9) Shall we rename the control channel the Primary channel and the extension channel the Secondary channel for a 40 MHz channel (for-40, against-5, abstain-26) Should L-STF be retained as an abbreviation (overwhelmingly for) ANA Category code for .11n High Throughput was requested Two Calls for Interest which will be vetted over the reflector: Decouple MAC and Phy so MAC more independent of Phy – Jon Rosdahl to lead Rationalize .11k (which is likely to finish before .11n) and .11n – Joe Levy to lead Planning for September and November Conference calls – Wednesdays, 11:00 to 13:00 ET starting August 2 through November 8 Special ad hoc Wednesday 9-13 through Friday 9-15 in Melbourne to resolve comments Special ad hoc Tuesday through Friday in either Santa Clara or Boston to resolve comments Special ad hoc Wednesday 11-8 through Friday in Dallas to resolve comments Time Line – D2.0 will likely be ready in January for another Letter Ballot; this would optimistically put publication of the standard out to April 2008 Bruce Kraemer, Marvell

20 September 2006 Approve Minutes Motion to approve July ‘06 TGn minutes as contained in r1 Move: Second: Bruce Kraemer, Marvell

21 September 2006 Agenda Planning Bruce Kraemer, Marvell

22 September 2006 September WG Graphic Bruce Kraemer, Marvell

23 Primary Goals for September
Continue Comment Resolution Review timeline Plan activities from end of Sep meeting thru Jan meeting Bruce Kraemer, Marvell

24 Agenda Logic Administrative details Status Summary 2 hours
September 2006 Agenda Logic Administrative details Status Summary Ad hoc Summary Reports Ad hoc Detailed presentations, discussions, comment resolution, preparation for approval motions in TGn TGn Ad hoc inspired presentations, discussions, comment resolution voting Review comment implementation (D1.03) and recycles Approve draft 1.04 Time Line Plans for future meetings 2 hours 24 hours 2 hours Bruce Kraemer, Marvell

25 Special Interest Topics
September 2006 Special Interest Topics Security review Matt = overview (1347= proposed resolutions) Jesse Walker Nancy Cam-Winget Dorothy Stanley Henry Ptanski Clint Chaplin Coexistence document revision Eldad Coexistence Comment resolution Waveform Generator Technical discussion in PHY Micha Anholt Draft incorporation – Editors meeting – 7am Tuesday in John Batman Suite Bruce Kraemer, Marvell

26 September 2006 doc.: IEEE /1132r3 September 2006 TGn –Sep ‘06 Schedule Meeting Room for the week: Bellarine Room 6 (5th level) Sep 18 Sep 19 Sep 20 Sep 21 Sep 22 Time Monday Tuesday Wednesday Thursday Friday 8:00-10:00 WG Plenary X 16 22 10:30-12:30 2 - Full TGn 8 24 13:30-15:30 4 10 18 26 16:00-18:00 12 20 28 19:30-21:30 6 14 am 1 am 2 pm 1 pm 2 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell

27 September 2006 doc.: IEEE /1132r3 September 2006 TGn –Sep ‘06 Schedule Meeting Room for the week: Bellarine Room 6 (5th level) Sep 18 Sep 19 Sep 20 Sep 21 Sep 22 Time Monday Tuesday Wednesday Thursday Friday 8:00-10:00 WG Plenary X 16 22 10:30-12:30 2 - Full TGn 8 24 13:30-15:30 4 10 18 26 16:00-18:00 12 20 28 19:30-21:30 6 14 am 1 +2 +2 am 2 +2 pm 1 +2 +2 pm 2 eve +4 +4 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

28 TGn – Main Room for the week: Bellarine Room 6 (5th level)
September 2006 doc.: IEEE /1132r3 September 2006 TGn – Main Room for the week: Bellarine Room 6 (5th level) Possible additional meeting space Note: You Yangs & John Batman holds ~12 Time Monday Tuesday Wednesday Thursday 8:00-10:00 WG Plenary X John Batman Suite 1 You Yangs Suite 2 10:30-12:30 2 - Full TGn 8 - Full TGn 13:30-15:30 4 - Full TGn 10 16:00-18:00 12 20 28 19:30-21:30 Bellarine 2 Corryong 2 Corryong 3 am 1 am 2 pm 1 pm 2 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell

29 September Rooms/Capacities
doc.: IEEE /1132r3 September 2006 September Rooms/Capacities Bellarine Bellarine Corryong Corryong You Yangs Suite Casual meetings only John Batman Suite 1 12 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

30 September 2006 doc.: IEEE /1132r3 September 2006 TGn –Sep ‘06 Schedule Meeting Room for the week: Bellarine Room 6 (5th level) Sep 18 Sep 19 Sep 20 Sep 21 Time Monday Tuesday Wednesday Thursday Friday 8:00-10:00 WG Plenary X Full TGn PHY MAC 22 10:30-12:30 2 - Full TGn Full TGn CA 24 13:30-15:30 Coex PHY 18 Full TGn 16:00-18:00 20 19:30-21:30 4 ad hocs am 1 Editor ad hoc You Yangs S 2 +1s +1s am 2 +1s pm 1 +1s +1s pm 2 eve +3 +3 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

31 September 2006 doc.: IEEE /1132r3 September 2006 TGn –Sep ‘06 Schedule Meeting Room for the week: Bellarine Room 6 (5th level) Sep 18 Sep 19 Sep 20 Sep 21 Time Monday Tuesday Wednesday Thursday Friday 8:00-10:00 WG Plenary X Full TGn PHY-vote MAC Frame PHY 10:30-12:30 2 - Full TGn Full TGn CA Full TGn 13:30-15:30 Coex Beam 16:00-18:00 19:30-21:30 2 ad hocs PHY,MAC Beam, Coex am 1 Editor ad hoc You Yangs S 2 Gen -batman am 2 +1s pm 1 +1s Gen -batman pm 2 eve +3 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

32 September 2006 Any other agenda items? Bruce Kraemer, Marvell

33 September 2006 Approve Agenda Motion to approve September ’06 TGn agenda as contained on slide (with any minuted amendments). Move: Second: Bruce Kraemer, Marvell

34 Introduction to Planning Discussion
September 2006 Introduction to Planning Discussion Bruce Kraemer, Marvell

35 Posted Timeline – as of Sept 18 ‘06
September 2006 Posted Timeline – as of Sept 18 ‘06 Bruce Kraemer, Marvell

36 11n - Overall timeline September 2006 HT SG Formed PAR Approved TGn
2002 2003 2004 2005 2006 2007 2008 HT SG Formed PAR Approved TGn Formed Publication REVCOM Approval First Sponsor Letter Ballot Selection Process & Criteria 2nd WG Letter Ballot Call for Proposals 1st WG Letter Ballot Proposal Presentations Confirmation Down Select Joint proposal Bruce Kraemer, Marvell

37 Comment Resolution Events
September 2006 Comment Resolution Events Weekly teleconferences Ad hoc – Melbourne, AU Sep ‘06 Interim – Melbourne Sep ‘06 Ad hoc – West coast Oct 17 – 19 ‘06 Ad hoc – Dallas Nov 8-10 ‘06 Plenary – Dallas Nov ‘06 Ad hoc – London Jan ‘07 Interim – London Jan ‘07 Details pending this week Details pending this week Blue -Proposed event, discussion pending Bruce Kraemer, Marvell

38 September 2006 End Chairs Report Bruce Kraemer, Marvell

39 Technical Editor’s Report 11-06-1372-r1
September 2006 Technical Editor’s Report r1 Bruce Kraemer, Marvell

40 September 2006 End of Opening Report Bruce Kraemer, Marvell

41 September 2006 Ad Hoc Leader Reports Bruce Kraemer, Marvell

42 ~ 10 minute Ad Hoc Reports Ad Hoc Topic .xls resolution file #
September 2006 ~ 10 minute Ad Hoc Reports Ad Hoc Topic .xls resolution file # Revision as of Sep am Beamforming & Adaptation 675 35 PSMP 687 29 General 688 31 MAC 690 34 PHY 693 39 Editorial 706 14 Frame Format 717 Coexistence 724 22 CA Doc 731 04 Bruce Kraemer, Marvell

43 TGn Tuesday update May 2006 September 2006 doc.: IEEE 802.11-06/1132r3
Bruce Kraemer, Marvell Bruce Kraemer, Marvell

44 Update X TGn –Sep ‘06 Schedule
September 2006 doc.: IEEE /1132r3 September 2006 Update TGn –Sep ‘06 Schedule Meeting Room for the week: Bellarine Room 6 (5th level) Sep 18 Sep 19 Sep 20 Sep 21 Time Monday Tuesday Wednesday Thursday 8:00-10:00 WG Plenary X Full TGn PHY-vote MAC Frame PHY 10:30-12:30 2 - Full TGn Full TGn CA 13:30-15:30 Coex Beam 16:00-18:00 19:30-21:30 2 ad hocs PHY – Bell 6 MAC –Bell 2 Coex – Bell 6 Beam–Bell 2 am 1 Editor ad hoc J Batman S 1 Gen - J Batman S 1 am 2 pm 1 Gen - J Batman S 1 pm 2 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell

45 New Room Options!! Wed 13:30 – 15:30
September 2006 New Room Options!! TGV has released Bellarine 3 Wed 13:30 – 15:30 TGm has finished for the week releasing Bellarine 5 : Tues 10:30 – 12:30 & 16:00 – 18:00 Wed 13:30 – 15:30 & 16:00 – 18:00 Bruce Kraemer, Marvell

46 Working update X TGn –Sep ‘06 Schedule
September 2006 B 5 = Bellarine 5 doc.: IEEE /1132r3 September 2006 Working update TGn –Sep ‘06 Schedule Meeting Room for the week: Bellarine Room 6 (5th level) Sep 18 Sep 19 Sep 20 Sep 21 Time Monday Tuesday Wednesday Thursday 8:00-10:00 WG Plenary X Full TGn PHY-vote MAC Frame PHY 10:30-12:30 2 - Full TGn Full TGn CA MAC B6 Beam B5 13:30-15:30 Coex Beam 3 ad hocs MAC – Bell 3 PHY- Bell 6 Gen – J Batman S1 16:00-18:00 Frame B6 PSMP B5 MAC B5 Coex B6 19:30-21:30 2 ad hocs PHY – Bell 6 MAC –Bell 2 Coex – Bell 6 Beam–Bell 2 am 1 Editor ad hoc J Batman S 1 Gen - J Batman S 1 am 2 B 5 Bellarine 3 pm 1 B 5 pm 2 B 5 B 5 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell

47 Approved TGn –Sep ‘06 Schedule X
September 2006 doc.: IEEE /1132r3 September 2006 Approved TGn –Sep ‘06 Schedule Meeting Room for the week: Bellarine Room 6 (5th level) Time Monday Tuesday Wednesday Thursday 8:00-10:00 WG Plenary X Full TGn B6 CA PHY-vote MAC Frame PHY 10:30-12:30 2 - Full TGn MAC B6 Beam B5 13:30-15:30 Coex Beam Coex B6 Beam B6 3 ad hocs MAC – Bell 5 PHY- Bell 6 Gen – J Batman S1? 16:00-18:00 Frame B6 PSMP B5 MAC B5 19:30-21:30 2 ad hocs PHY – Bell 6 MAC –Bell 2 Coex – Bell 6 Beam–Bell 2 Sep 18 Sep 19 Sep 20 Sep 21 Editor ad hoc J Batman S 1 am 1 Gen - J Batman S 1? am 2 Bellarine 3 pm 1 pm 2 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell

48 TGn Meeting Room Update - Tuesday
September 2006 doc.: IEEE /1132r3 September 2006 TGn Meeting Room Update - Tuesday Time Tuesday 8:00-10:00 10:30-12:30 13:30-15:30 Sequential ad hocs Coex - Bellarine 6 Beam - Bellarine 6 16:00-18:00 2 simultaneous ad hocs Frame - Bellarine 6 PSMP - Bellarine 5 19:30-21:30 Coex - Bellarine 6 Beam - Bellarine 2 Sep 19 am 1 am 2 pm 1 pm 2 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell

49 Comment Resolution Events
September 2006 Comment Resolution Events Weekly teleconferences Ad hoc – Melbourne, AU Sep ‘06 Interim – Melbourne Sep ‘06 Ad hoc – West coast Oct 17 – 19 ’06 Move to Portland approved unanimously Ad hoc – Dallas Nov 8-10 ‘06 Plenary – Dallas Nov ‘06 Ad hoc – London Jan ‘07 Interim – London Jan ‘07 Details pending this week Blue -Proposed event, discussion pending Bruce Kraemer, Marvell

50 TGn Wednesday update May 2006 September 2006
doc.: IEEE /1132r3 May 2006 TGn Wednesday update Bruce Kraemer, Marvell Bruce Kraemer, Marvell

51 TGn Meeting Room Update - Wednesday
September 2006 doc.: IEEE /1132r3 September 2006 TGn Meeting Room Update - Wednesday Time Mon Tue Wednesday - Sep 20 8:00-10:00 Full TGn - Bellarine 6 PHY- vote CA presentation - Bellarine 6 MAC ad hoc - Bellarine 6 General – J Batman S1 10:30-12:30 WG Plenary 13:30-15:30 3 concurrent ad hocs MAC – Bellarine 5 PHY- Bellarine 6 16:00-18:00 2 concurrent ad hocs MAC Bellarine 5 Coex Bellarine 6 19:30-21:30 X am 1 Move into ad hoc mode when Full TGn business is completed am 2 pm 1 pm 2 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell

52 September 2006 C 1 = Corryong 1 doc.: IEEE /1132r3 September 2006 TGn –Sep ‘06 Schedule Meeting Room for the week: Bellarine Room 6 (5th level) Time Monday Tuesday Wednesday Thursday 8:00-10:00 WG Plenary X Full TGn B6 CA PHY-vote MAC Frame PHY 10:30-12:30 2 - Full TGn MAC B6 Beam B5 13:30-15:30 Coex Beam Sequential ad hocs Coex - Bellarine 6 Beam - Bellarine 6 3 ad hocs MAC – Bell 5 PHY- Bell 6 Gen – J Batman S1? 16:00-18:00 2 concurrent ad hocs Frame - Bellarine 6 PSMP - Bellarine 5 MAC B5 Coex B6 19:30-21:30 2 ad hocs PHY – Bell 6 MAC –Bell 2 Coex - Bellarine 6 Beam - Bellarine 2 Sep 18 Sep 19 Sep 20 Sep 21 Editor ad hoc J Batman S 1 am 1 Gen - J Batman S 1? C 1 am 2 pm 1 pm 2 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell

53 September 2006 C 1 = Corryong 1 doc.: IEEE /1132r3 September 2006 TGn –Sep ‘06 Schedule Meeting Room for the week: Bellarine Room 6 (5th level) Time Monday Tuesday Wednesday Thursday 8:00-10:00 WG Plenary X Full TGn B6 CA PHY-vote MAC Frame PHY 10:30-12:30 2 - Full TGn MAC B6 Beam B5 13:30-15:30 Coex Beam Sequential ad hocs Coex - Bellarine 6 Beam - Bellarine 6 3 ad hocs MAC – Bell 5 PHY- Bell 6 Gen – J Batman S1? 16:00-18:00 2 concurrent ad hocs Frame - Bellarine 6 PSMP - Bellarine 5 MAC B5 Coex B6 19:30-21:30 2 ad hocs PHY – Bell 6 MAC –Bell 2 Coex - Bellarine 6 Beam - Bellarine 2 Sep 18 Sep 19 Sep 20 Sep 21 Editor ad hoc J Batman S 1 am 1 Gen - J Batman S 1? C 1 am 2 pm 1 pm 2 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell

54 TGn Meeting Room Update - Thursday
September 2006 doc.: IEEE /1132r3 September 2006 TGn Meeting Room Update - Thursday Time Mon Tue Wed Thu 8:00-10:00 Frame - Corryong 1 PHY – Bellarine 6 10:30-12:30 Full TGn – Bellarine 6 13:30-15:30 16:00-18:00 19:30-21:30 X am 1 am 2 pm 1 pm 2 eve Bruce Kraemer, Marvell Bruce Kraemer, Marvell


Download ppt "TGn Opening Report – September ‘06"

Similar presentations


Ads by Google