Presentation is loading. Please wait.

Presentation is loading. Please wait.

ORGANISATIONAL PROFILE

Similar presentations


Presentation on theme: "ORGANISATIONAL PROFILE"— Presentation transcript:

1 ORGANISATIONAL PROFILE
MTI ENGINEERING ORGANISATIONAL PROFILE Address: 16 & 18 Kleim street, Carletonville, South Africa, Tel: +27 (0)18  GPS co-ordinates: SOUTH 26º 20, 917 EAST 27º 24, 975 Vat.No.: Reg.No.: 1988/05995/07 2018/09/17 Revision 01 (Template Revision Date: 2017/12/01)

2 VISION & MISSION Our Vision: To be the preferred partner of choice for turnkey projects in the mining and construction industry through the provision of world class metal and engineering services. Our Mission: We will achieve our vision through continuous interaction with our customers providing safe and high quality products and services. Values: Honesty Trustworthiness Commitment Customer satisfaction Teamwork Employee wellbeing

3 Company Overview MTI Engineering, trading as Mine-Tech Industries was established in 1988 to offer its clients reliable, high quality and cost effective mechanical, electrical and civil products and services. Over the years MTI Engineering has established itself as the preferred supplier of structural and civil engineering services to the mining industry. MTI Engineering offers its clients structural and civil design services and detailing, steel fabrication, site erection and project management. MTI Engineering is devoted to the continuous development and growth of its employees, products and services and a culture of quality, is engendered through leadership, training and communication.

4 Management Structure Corporate Services Director Jacel Visagie
Jonas Maxolo (& Workers Trustee) Operations Director Johan Schoeman Area Manager Tommy Palmer Health & Safety Officer Uil Marx Financial Supervisor Elisme Schoeman Site Manager Ettiene Fourie Estimator Patrick Welman Logistics’ Controller Rassie vd Berg

5 Accident Analysis

6 Injury Frequency Rates

7 BEE MTI Engineering is a Empowering Supplier in terms of the government gazetted code of good practice on B-BBEE. The Company is committed to the empowerment of HDI and is committed to all the elements of the B-BBEE Act. MTI Engineering has a 26% HDI employee trust. BBBEE certificate available on request.

8 Photo Gallery AngloGold Ashanti – Ice Plant Structure
Anglo Platinum – Vent Ducting

9 Photo Gallery South Deep – Backfill Plant South Deep – Backfill Plant

10 Photo Gallery Ekurhuleni Municipality – Pedestrian Bridge
Letseng Diamonds – Conveyor System South Deep – Cip Tank Gold Fields – 800nb Pipe Line

11 Technicrete – Brick Plant (Witbank)
Photo Gallery Xstrata Rhovan – 3CR12 Barren Tank Sibanye Gold Kloof - Overland Conveyor Head Pulleys Technicrete – Brick Plant (Witbank)

12 Photo Gallery Xstrata Rhoven - MC7 Conveyor and Feed Chute System
Sibanye Gold Kloof - Overland Conveyor

13 Photo Gallery Driefontein – 1.5 Megaliter Water Tank
Driefontein - CSP Project.

14 Growth Project & Growth Plant Upgrade for Gold Recovery from Rock Dump
Photo Gallery Sibanye Gold Kloof - Growth Project & Growth Plant Upgrade for Gold Recovery from Rock Dump

15 Growth Project & Growth Plant Upgrade for Gold Recovery from Rock Dump
Photo Gallery Sibanye Gold Kloof - Growth Project & Growth Plant Upgrade for Gold Recovery from Rock Dump

16 Photo Gallery Piping - various

17 Photo Gallery Rhovan mine - Ducting

18 Storm Mountain Diamonds – Kao Mine Plant Upgrade Project
Photo Gallery Storm Mountain Diamonds – Kao Mine Plant Upgrade Project

19 Combined workspace in excess of 1790m² equipped with
Photo Gallery Vehicle Fleet Workshop Facilities: Combined workspace in excess of 1790m² equipped with a 10 ton, 5 ton and 2 ton overhead crane and two 3 ton electric crawls. Other equipment includes plate rollers, bending brake, punch and shears, magnetic base drill, milling machines, vertical boring mill, pedestal drill and grinder etc. Vehicle Fleet: MTI Engineering’s fleet consist of one JCB Loadall , a HINO F with a 3ton HIAB crane, Maxus V80, Datsun Go and six Toyota Hilux bakkies.

20 Project History-Milestones
Project: Kao Mine Plant Upgrade Project Client: Storm Mountain Diamonds - Lesotho Project Value: R (Forty six million rand) Execution Date: October 2016 Project: New Coarse Final Recovery Plant Client: Letseng Diamonds - Lesotho Project Value: R (Seven million rand) Execution Date: March 2015 – September 2015 Project: Refrigeration Plant Client: BBE Projects - Driefontein Project Value: R (Six million rand) Execution Date: April 2015 – October 2015 Project: 1.5 Megaliter Water Tank Client: Sibanye Gold - Driefontein Project Value: R (Four million rand) Execution Date: March 2015 – Sept 2015 Project: Brick Plant Client: Technicrete - Witbank Project Value: R (Two million rand) Execution Date: January 2014 – March 2014 Project: Overland Conveyor – Manufacturing & installation Client: Sibanye Gold - Kloof Project Value: R (Twenty million rand) Execution Date: October 2012 – March 2014 Project: Solid Ice Plant Client: Mponeng – Anglo Gold Project Value: R (Seven million rand) Execution Date: April 2013 – January 2014

21 Project History-Milestones
Project: Merensky Upgrade – Structural steel, tanks and pipework Client: Impala - Rustenburg Project Value: R (Ten million rand) Execution Date: February 2013 – July 2013 Project: MC7 Conveyor – Conveyor and feed chute system Client: Xstrata - Rhovan Rustenburg Execution Date: November 2012 – August 2013 Project: Growth Plant Upgrade (“upstage” gold recovery from rock dump) Client: Sibanye Gold - Kloof Execution Date: February 2012 – Jun 2012 Project: Growth Project (gold recovery from rock dump) Project Value: R (Five million rand) Execution Date: September 2011 – January 2012 Project: Conveyor System – Conveyor and feed chute system Client: Letseng Diamonds - Lesotho Project Value: R (Seven million rand) Execution Date: December 2009 – October 2010 Project: Filter Building – Structural steel and sheeting Client: Vametco - Brits Project Value: R (Four million rand) Execution Date: February 2009 – August 2009 Project: Waste Loading Station–Conveyor, feed chute & pumping system Client: Harmony Mine - Randfontein Project Value: R (Fifteen million rand) Execution Date: March 2008 – February 2009 2018/09/17

22 Contact Us / List of Vendors
MTI Engineering Contact Details PO BOX Tel: (018) Carletonville, Fax: (018) 16 Kleim Street, Industrial Area, Carletonville Work done for: Sibanye Gold Xstrata Rhovan ADP Projects (Pty) Ltd Thyssenkrupp/ Polysius Corobrick Aveng Grinaker Concor Technicrete MDM Engineering Impala Platinum Evraz Vametco Howden Process Compressor Lonmin Platinum Nola De Beers Anglogold Zinc Corp – Kumba Resources Harmony Master Drilling Pilanesberg Platinum Mines Gold Fields 2018/09/17


Download ppt "ORGANISATIONAL PROFILE"

Similar presentations


Ads by Google