2 1 - ENERGY/ ELECTRICITY Safety Supply - Prevent accidents
Risks : Electrification Electrocution Fire Equipment damages Your role as a logisitician : - Prevent accidents - Protect appliances Supply Power supply sources : City power (local grid) Power generator Battery kit with solar Sources d’appoint : Battery kit UPS (Inverter all-in-one) Your role as a logisitician : - Insure electrical availability (Quantity and quality) - Improve electrical usage 16 septembre 2018

3 1.1 ELECTRICAL SAFETY 16 septembre 2018

4 Quick Assessment Use the table to make quick assessment of installations : At your arrival When renting a new place Available on kitlog online Useful to do a quick assessment of the 5 essential safety rules If the building is noted : 0 to 3 / 10 : Building need emergency works, HQ advisor must be notified 4 to 7 / 10 : Works are to be planned. It is necessary to plan adapted budgets to perform it during the next 6 months 8 to 10 / 10 : The building is at minimum standard level. You can plan small works to improve user’s safety conditions 16 septembre 2018

5 No possibilty of direct contact = 1 pt
Basic safety rule #1 No possibilty of direct contact = 1 pt That happens especially with detached switches and outlets, when an equipment is removed and not replaced, on bad connection of two wires If you notice nude wires or any possibility of direct contact, you have to make works to avoid them 16 septembre 2018

6 Basic safety rule #1 As a vehicle, an electrical installation need a maintenance That must be planned and budgeted : City apartment 300 à 500 € Individual building 1000 € Isolated Compound 1500 € 16 septembre 2018

7 Basic safety rule #2 No electricity more close than 1,5 m from water
No wire, socket, switch or electrical equipment of any kind That concerns bathrooms, kitchens, any room with tap, … And also water dispensor ! Because of possible leackage Water Computer UPS Photocopier 16 septembre 2018

8 Do not wait the incident or somebody obliges you to do it !
Basic safety rule #2 Whatever skills or countries, a local electrician is able to create a new socket outlet and to disconnect and seal the old one. Do not wait the incident or somebody obliges you to do it ! => Remove these items from water immediately 16 septembre 2018

9 Electrical panel (switch board) = 3pts
Basic safety rule #3 Electrical panel (switch board) = 3pts Building must have an electrical switch board => 1pt Correctly fixed, without signs of burn => 1pt With adapted protections => 1pt 1pt 2pt 3pt 16 septembre 2018

10 All equipement must be protected by circuit breaker or fuses
Basic safety rule #3 All equipement must be protected by circuit breaker or fuses If you don’t have any circuit-breaker or fuses on your building, your situation is an emergency. You have to contact an electrician to make works, or the HQ referent at least If you have, make a test : switch all them off and verify if some equipment still supplied. If yes, that means that they are not protected. You have to contact an electrician to make works 16 septembre 2018

11 Basic safety rule #4 Size of cables = 1 pt 16 septembre 2018

12 Wires have to respect minimum standard sizes
Basic safety rule #4 Wires have to respect minimum standard sizes An under-sized cable if hot, and can burn. If you don’t have any electrical notion, but you touch a wire and you feel it is hot, it is not normal ! and you have to change it. That mainly happens with heavy equipment (boilers, heaters, air conditioning, …), with long wires, and with overload multi-plugs. Wire undersized is the first cause of fire starts ! Please refer to electrical and saftey guidelines to choose the size of wires. 16 septembre 2018

13 Basic safety rule #5 Equipment using water or made of a steel frame
must be connect to the earth = 2 pts To verify it, you can buy an outlet tester => If you don’t have earth connection on heavy equipment and equipment with steel frame, you must contact an electrician to install it. Be careful if you want to verify it without tester : to have an earth cable in you socket outlet don’t mean that this cable is connecter to this earth. If you don’t have earth connection on your building, the minimum protection you can install is a differential circuit breaker 16 septembre 2018

14 Basic safety rule #General
If you have any doubt, don’t touch… …and ask a local electrician or the HQ Most of the time, send a picture will be enough to : Identify and evaluate the problem Explain what works to do and how Plan incoming costs, … To not care of installation maintenance is like transform maintenance operation in renewal operation Renewal costs are often heavy and can not be taken in charge by the mission 16 septembre 2018

15 1.2 ELECTRICAL SUPPPLY Production & extra sources
16 septembre 2018

16 Minimum setup regarding the context
GREEN YELLOW ORANGE RED BLACK MAIN SOURCE LOCAL GRID OR POWER GENERATOR SECONDARY SOURCE OPTIONNAL IF GOOD LOCAL GRID POWER GENERATOR OR BATTERY KIT BATTERY KIT WITH SOLAR NB : Hibernation room must be supplied with a battery kit NIGHT LIGHTING OBLIGATION 16 septembre 2018

17 Local Grid Power sheddings (power cuts) Fluctuations
Panneaux de raccordement Local Grid Power sheddings (power cuts) Identify the shedding length and frequency Keep in mind : A battery need need 4 to 8hr of charging Obligation to have an emergency power source Fluctuations Buld intensity fluctuations, Fluorescent bulds what not works correctly, UPS beeping when bulds still illuminated, … Small stabilizer on Equipment to protect Voltage peaks (surges) Surge protector : Heavy stabilizer on the full building 16 septembre 2018

18 Power generator 0 kVA 6 kVA 12 kVA Power (1 kVA = 0.8 kW) 3000 to 3600 RPM 1500 to 1800 RPM Single phase 3-Phase 1 – Evaluate the necessary power => Diagnosis tool on kit log 2 – Check the type of connection to city power and choose the same generator, if not possible Generator 3-phase with Building Single phase => Works to plan Generator Single phase with Building 3-Phase => Heavy works to plan 3 – Make it validate before to buy 16 septembre 2018

19 Power Generator Frequent Problems Mainly caused by … Obligations :
Voltage fluctuation Overload Overload on one phase (3-phase only) Alternator regulator problem Permanent low voltage Alternator problem Low voltage shutdown or High Temperature shutdown Bad ventilation Fuel leaks Bad fuel quality Obligations : => Dispose the logbook next to the generator => Stand at attention about fuel consumption Recommendations : => Oil change every 250 hours => Heavy maintenance each 2500 to 3000 hours => Maximum life length hours with good maintenance 16 septembre 2018

20 Battery kit HQ purchase Local purchase Size Max power runtime
Main sold as all-in one product Charger / Inverter Batteries Maintenance 12 month Installation and connexion Standard price : 0,40 à 0,5 € / VA Warning, charging time are often very long (>8hrs) because chargers are not powerful Size Max power runtime Small 2,5 kVA 700 W during 8 h Medium 3,6 kVA 1 000 W during 8 h Large 7,2 kVA 1 500 W during 8 h 16 septembre 2018

21 Ressources Local electricians Kit-Log online
16 septembre 2018

22 Keep in mind Almost nothing can be done without a energy supply :
=> have a proper back-up Do not forget the maintenance of your equipment and installations Security and good environment practices are the same everywhere in the world While buying equipment: Take time to assess your needs Take into account total life-cycle cost (fuel, maintenance, disposal…) and not only initial cost Anticipate your works and costs More details on the kit log Contact : 16 septembre 2018