Presentation is loading. Please wait.

Presentation is loading. Please wait.

Health Risk Assessment (HRA): Workshop Guide

Similar presentations


Presentation on theme: "Health Risk Assessment (HRA): Workshop Guide"— Presentation transcript:

1 Health Risk Assessment (HRA): Workshop Guide

2 What is an HRA? An HRA identifies and ranks the hazards in your community according to the following equation:

3 What questions does an HRA answer?
How likely is it that this hazard will turn into an event? What impact would this event have on the public’s health? What measures do we have in place to mitigate this risk?

4 Why are we doing an HRA? Grant Funding Planning
Statement of Work for local health departments Requirement for partnership and collaboration Funding Documents risk for funding requests and justifications Future grant alignment and partnership requirements Identifies gaps in funding needs for preparedness initiatives Planning Health Risk Assessment (HRA) linked to public health preparedness capabilities Coordinates and improves county planning

5 How does the HRA relate to an HVA?
Planning Exercises Mitigation

6 How does this benefit my county?
Strategic planning Prioritization of resources Inventory of strengths Documentation for funding requests and justifications Rethinking preparedness How do we define mitigation? How do we define preparedness? Partnership building Engaging partners outside of preparedness and public health Aligning with other assessments to enhance efficiency

7 What will I get from this process?
A county health preparedness profile GIS resources Fulfill a grant requirement for community participation/partnership Identify areas for improvement in agency plans Identify strengths in agency plans Document baseline preparedness to assess progress Learn about the preparedness perspectives of different agencies

8 What is your role in this process?
Represent Contribute Commit

9 Questions?

10 Housekeeping

11 Paperwork Sign-in Non-disclosure agreement
Please complete now Evaluation will be sent out via SurveyMonkey Please include your address on the sign-in sheet

12 Part I: Hazard Prioritization Tool

13 Step 1: Identify additional hazards
Review list of hazards and definitions (10 minutes) Hazard = initial source of danger (hurricane vs. flood – separate hazards)

14 Step 2: Discussion and Consensus
What additional hazards did you identify (if any)? How would you define these hazards? Voting/consensus Does this hazard fit the definition of a hazard? (Y/N) A new hazard must have a majority vote to be included in list

15 Step 3: Rank hazards (30 minutes)
Add any additional hazards to Worksheet 1 Rank hazards using the instructions and definitions provided Complete this form individually Turn in completed worksheet to facilitator

16 PARTICIPANT BREAK

17 Part II: Impact Planning Tool

18 Step 1: Fill-out impact worksheet
Using the top hazard identified by the group in Part I, each agency should fill-out a separate, sector-specific worksheet If more than one representative from your agency is present, please return a single worksheet for your agency to the facilitator Public health and “other” agencies will fill-out a single impact worksheet as a group

19 General indicator scale
The 0-4 rating scale is specific to each indicator; however, 0-4 generally means the following: 0 = None: Added impact of disaster is negligible 1 = Minimal: Adequately handled by agency using existing resources 2 = Moderate: Stretches capacity of existing resources; draws upon mutual aid/Memorandums of Understanding (MOUs) within the county 3 = Severe: Needs far exceed capacity of local authority and must call on surrounding counties for aid 4 = Catastrophic: Available resources are overwhelmed, requiring state or federal assistance

20 Part III: Mitigation Planning Tool

21 Step 1: Community mitigation
As a group (all workshop participants), fill-out the community mitigation worksheet

22 Step 2: Agency mitigation
For your agency, fill-out the mitigation worksheet If there is more than one representative from your agency, please return a single completed worksheet to the form checker/facilitator

23 Part V: Next Steps

24 HRA Project Timeline Key Dates:
Toolkit Development and Testing Toolkit Training and Implementation State-level Analysis and Report Toolkit revision Key Dates: LHD Workshops/Assessments Late May-June 2012 Results due via SurveyMonkey June 29th State analysis July 2012 Analysis due to CDC 8/8/2012 Final report to partners September/October 2012 Regional report back Fall 2012 Strategic planning Fall 2012/Spring 2013

25 Please return the following:
Blank forms Non-disclosure agreements Worksheet 1: Hazard Prioritization Worksheet 2: Impact Worksheet 3: Mitigation

26 Thank you!