1 Production Reporting and Verification
Lee-Ann Martin, Program Manager Production Reporting and Verification Petroleum Accountants Society of Oklahoma February 2017

2 Disclaimer The statements or opinions expressed in all ONRR presentations and panel discussions at the 2017 PASO-Tulsa Federal/Indian Royalty Compliance Workshop do not necessarily represent the views of ONRR or the Department of the Interior.

3 upon completion of this course.
Learning Objective The attendee will be provided an overview of the Production Reporting and Verification department and its responsibilities upon completion of this course.

4 Production Reporting and Verification
Lee-Ann Martin Program Manager Lydia Barder Program Support Manager Jonathan Swedin Onshore Production Reporting Manager Sonny Betancourt Onshore Team 1 Supervisor Luke Lundmark Onshore Team 2 Supervisor Mark Reynolds Onshore Team 3 Supervisor Susan Long Offshore Production Reporting Manager Vicky Stafford Offshore Team 1 Supervisor Crystel Sandos Offshore Team 2 Supervisor Ken Stamper Production Inspection and Verification Manager

5 Topics Production Reporting Requirements OTR/NONC Process
Expected System Changes due to BLM Rules FMPs Edits on FMPs Inventories System Capability Number of OGOR Lines Processed Monthly Tools for Assistance

6 Production Reporting Requirements
If you operate a Federal or Indian oil and gas lease or agreement, you must file an OGOR each month for each active lease or agreement when there are wells that are not permanently plugged or abandoned or when inventory exists for the property (paraphrased from 30 CFR § ) Reports are due electronically to ONRR approximately 45 days after the production month ends January OGOR is due March 15th The operator does not have to report a well in drilling status unless there is associated test production 3 3

7 Enforcement Process: OTRs and NONCs

8 System Changes Question: What OGOR or other reporting changes are expected as a result of the final Federal oil and gas valuation rule (part of the Consolidated Federal Oil & Gas and Federal & Indian Coal Valuation Reform) or the new BLM oil/gas measurement regulations and the final rule entitled, “Waste Prevention, Production Subject to Royalties, and Resource Conservation”? 3 3

9 Facility Measurement Point
FMP: Defined by ONRR as a facility that sells, stores, or transfers Federal or Indian production prior to or at the point of royalty determination; for example, gas plants, tank batteries, or other inventory storage points. A facility/measurement point is also defined as a metering point where Federal or Indian production is measured for sales, transfers, or royalty determinations; for example, LACT units or orifice meters. 3 3

10 Facility Measurement Point
Question: Will the new BLM FMP numbers be required for reporting on the OGOR for both gas and oil? Answer: Yes Question: If so, will there be edits for the reporting of the FMP numbers? 3 3

11 Facility Measurement Point
Question: It appears that oil inventories will be maintained at a lower level, resulting in the ending inventory from the prior month now being split to multiple “beginning inventory” FMP numbers. How does ONRR plan to deal with all of the error messages when this transition occurs? Answer: We are currently working on a plan to address this issue. 3 3

12 Facility Measurement Point
Question: With the increase in the number of lines to be reported on the OGOR, does ONRR anticipate any problems due to ONRR’s line count limits? Answer: No 3 3

13 Total Production Lines Processed

14 Tools for Assistance website Reporting/Paying – Production Reporting Minerals Production Reporter Handbook is the Handbooks page Oil and Gas Reporter Training Guide for Form ONRR-4054 (OGOR) is the Reporter Training page Production Reporting Contacts is the OGOR – Oil and Gas Operations Report (Form ONRR-4054) and Error Correction Contacts page Maintain Your System Access and Contact Information includes information on completing the EMARF and the ONRR-4444 Production Reporting References includes How to Resolve Errors documents, OGOR Video Training, Offshore FMP information, Reporting Codes, Reporter Letters, and Regulation links

15 Program Manager, Production Reporting and Verification
Contact Us: Lee-Ann Martin Program Manager, Production Reporting and Verification (303) 15


Download ppt "Production Reporting and Verification"

Similar presentations


Ads by Google