Presentation is loading. Please wait.

Presentation is loading. Please wait.

Overview of timelines for ACCESS systems porting to Ngamai

Similar presentations


Presentation on theme: "Overview of timelines for ACCESS systems porting to Ngamai"— Presentation transcript:

1 Overview of timelines for ACCESS systems porting to Ngamai
Including CAWCR and NMOC tasks

2 August September October November Changes:
CAWCR ACCESS APS1 team build and document UM exe VAR exe OPS exe Surf exe SCS suite For APS G1 R1 C1 CAWCR ACCESS APS trials using past data for G1 R1 C1 ~ 2 weeks Output data into MARS / SAM Verification by plots, verify, rainval ~2 weeks CAWCR ACCESS team support of NMOC porting For APS TC1 G2 Ensemble TC1 G2 Ensemble NMOC APS team commence constructing SMS suites NMOC APS team build SMS suites and downstream processing suites NMOC APS trials using past and real-time data for 4 weeks TC1 NMOC downstream trials Switchover of output of Operational products from Solar to Ngamai Provision of Ngamai generated data sets for dependent suites, CAWCR and NMOC Changes: a) Added ensemble systems to APS *2*, in research-only mode. The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology


Download ppt "Overview of timelines for ACCESS systems porting to Ngamai"

Similar presentations


Ads by Google