Presentation is loading. Please wait.

Presentation is loading. Please wait.

Presentation NORTH WEST PROVINCE

Similar presentations


Presentation on theme: "Presentation NORTH WEST PROVINCE"— Presentation transcript:

1 Presentation NORTH WEST PROVINCE
April 2016

2 A. ACTUAL PERFORMANCE INFORMATION PER HOUSING PROGRAMME

3 2015/16 MTSF Picture per Programme
Planned Annual Target 1 April ‘15 to 31 March 2016 Actual Delivery to date 1 April’15 to 31 March 2016 Variance MTSF PICTURE PER PROGRAMME Total Planned Sites Total Planned Units Total Budget Allocation Sites Units Total Expenditure TOTAL IRDP 3 205 3 673 1 835 3 197 -1 370 -476 2.2a Integrated Residential Development Programme :Phase 1:Planning and Services 2.2c Integrated Residential Development Programme :Phase 2:Top Structure Construction 2.3a People's Housing process 168 23 954 118 8 209 -50 UISP TOTAL 1 020 2 430 3 969 2 446 2 949 16 2.2b Integrated Residential Development Programme :Phase 1:Planning and Services INFORMAL SETTLEMENTS 2.2d Integrated Residential Development Programme :Phase 2:Top Structure Construction INFORMAL SETTLEMENTS 2.2e Integrated Residential development Programme :Phase 4:Top Structure Construction (INFORMAL SETTLEMENTS) 2.3b People's Housing Process INFORMAL SETTLEMENTS 2.4 Informal Settlement Upgrading

4 2015/16 MTSF Picture per Programme
Planned Annual Target 1 April ‘15 to 31 March 2016  Actual Delivery to date 1 April’15 to 31 March 2016  Variance SOCIAL AND RENTAL HOUSING INCLUDING CRU TOTAL 296 252 80 961 -44 3.1 Institutional Subsidies 278 36 000 20 325 -278 3.2b Social Housing: Capital Grants for rental housing (Funded by NDoH) 3.3b Community residential units (CRU) Constructed 272 -20 RURAL HOUSING TOTAL 550 -298 4.1 Farm Worker Housing Assistance 4.2 Rural Housing: Communal land rights 182 1 996 586 3 611 404 1 615 SUBSIDIES TOTAL 1.1a Individual housing subsidies (R0 - R3 500) credit linked 1.1b Individual housing subsidies (R0 - R3 500) Non - Credit Linked 100 16 057 126 19 323 26 1.2 Housing finance linked Individual subsidies (FLISP)-(R R7 000) 277 23 359 -277 2.5a Consolidation Subsidies (Excluding Blocked Projects)

5 2015/16 MTSF Picture per Programme
Planned Annual Target 1 April ‘15 to 31 March 2016 Actual Delivery to date 1 April’15 to 31 March 2016 Variance 5. PRIORITY PROJECTS 332 36 147 17 1 1 686 -331 6. PROVINCIAL SPECIFIC PROGRAMMES 18 288 29 283 TOTAL NATIONAL MTSF TARGET Emergency Housing Programme (new units) 308 36 400 367 50 853 59 Total for Emergency Houising Total targets Military Veterans Title Deeds Backlog (Pre-1994) Title Deeds Backlog (Post-1994) 586 Title Deeds (New Developments)

6 PROGRAMMES FOR MINING TOWNS
Planned Annual Target 1 April ‘15 to 31 March 2016 Actual Delivery to date 1 April’15 to 31 March 2016 Variance PROGRAMMES FOR MINING TOWNS Total Planned Sites Total Planned Units Total Budget Allocation Sites Units Total expenditure Kgetleng Rivier 866 477 59 102 -389 Madibeng 792 473 -319 Matlosana 966 732 1 815 -966 1 083 Moses Kotane 484 1 070 586 Rustenburg 2 417 1 211 1 435 1 041 -982 -170 Grand Total 3 383 4 085 4 876 -1 948 791

7 PROGRAMMES PROPOSED NOT TO BE FUNDED BY THE HSDG
Planned Annual Target 1 April ‘15 to 31 March 2016 Actual Delivery to date 1 April’15 to 31 March 2016 Variance PROGRAMMES PROPOSED NOT TO BE FUNDED BY THE HSDG Total Planned Sites Total Planned Units Total Budget Allocation Sites Units Total expenditure 1.5a Rectified RDP Stock 111 27 712 132 19 087 -111 1.5b Rectification of Housing Stock (pre 1994) 209 17 287 -209 1.9 Blocked Projects 1.12 Housing Chapters of IDP's 2.1 Project Linked Subsidies (current commitments approved up to 31/03/07) 482 42 778 15 869 93 713 387 2.5b Consolidation Subsidies (Blocked Projects) 2.6 Emergency Housing Assistance 3.3a Community Residential Units (CRU) Converted/Upgraded 24 2 577 -24 Emergency (existing units) TOTAL 826 90 354 147 43

8 PROGRAMMES THAT NEED ADDITIONAL REPORTS
Planned Annual Target 1 April ‘15 to 31 March 2016 Actual Delivery to date 1 April’15 to 31 March 2016 Variance PROGRAMMES THAT NEED ADDDITIONAL REPORTS Total Planned Sites Total Planned Units Total Budget Allocation Sites Units Total expenditure 1.3 Enhanced Extended Discount Benefit Scheme (EEDBS) 1.4 State Asset Maintenance Programme 1.6 Social and Economic Facilities 10 000 1.8 Operational Capital Budget 51 908 52 417 1.11a Land parcels procured(IHAHSD) 85 000  Total

9 OTHER PROGRAMMES TO BE FUNDED
Planned Annual Target 1 April ‘15 to 31 March 2016 Actual Delivery to date 1 April’15 to 31 March 2016 Variance OTHER PROGRAMMES THAT ARE TO BE FUNDED Total Planned Sites Total Planned Units Total Budget Allocation Sites Units Total expenditure 1.10 NHBRC enrolment (related to grant) 36 080 21 265 3.2a Social Housing: Operational Support 1.7 Accredited Municipalities (level 1 & 2): Disaster Relief 34 962 44 941 Total 71 042 66 206

10 2016/17 DELIVERABLES AND BUDGETS
B. PLANNED TARGETS AND BUDGETS PER HOUSING PROGRAMME

11 MTSF PLANNED TARGETS MTSF PICTURE PER PROGRAMME Total Sites Budget for Sites Total Units Budget for Units Total Allocation per programme TOTAL IRDP 142 18 118 2.2a Integrated Residential Development Programme :Phase 1:Planning and Services 2.2c Integrated Residential Development Programme :Phase 2:Top Structure Construction 2.3a People's Housing process UISP TOTAL 6 913 6 499 2.2b Integrated Residential Development Programme :Phase 1:Planning and Services INFORMAL SETTLEMENTS 4 525 2.2d Integrated Residential Development Programme :Phase 2:Top Structure Construction INFORMAL SETTLEMENTS 2.2e Integrated Residential development Programme :Phase 4:Top Structure Construction (INFORMAL SETTLEMENTS) 48 5 281 2.3b People's Housing Process INFORMAL SETTLEMENTS 50 6 924 2.4 Informal Settlement Upgrading 2 388 76 252 1 168

12 MTSF PLANNED TARGETS MTSF PICTURE PER PROGRAMME Total Sites Budget for Sites Total Units Budget for Units Total Allocation per programme SOCIAL AND RENTAL HOUSING INCLUDING CRU TOTAL 3 301 632 99 873 3.1 Institutional Subsidies 3.2b Social Housing:Capital Grants for rental housing (Funded by NDoH) 1 662 612 87 701 89 363 3.3b Community residential units (CRU) Constructed 1 639 20 12 172 13 811 RURAL HOUSING TOTAL 767 14 639 4 876 4.1 Farm Worker Housing Assistance 4.2 Rural Housing: Communal land rights SUBSIDIES TOTAL 2 865 34 3 213 6 078 1.1a Individual housing subsidies (R0 - R3 500) credit linked 1.1b Individual housing subsidies (R0 - R3 500) Non - Credit Linked 1.2 Housing finance linked Individual subsidies (FLISP)-(R R7 000) 2.5a Consolidation Subsidies (Excluding Blocked Projects)

13 MTSF PLANNED TARGETS Total Total targets 103 81 629 7 680 353 892
MTSF PICTURE PER PROGRAMME Total Sites Budget for Sites Total Units Budget for Units Total Allocation per programme 5. PRIORITY PROJECTS 6. PROVINCIAL SPECIFIC PROGRAMMES 103 81 629 TOTAL NATIONAL MTSF TARGET Emergency Housing Programme (new units) Total Total targets 7 680 12 581 Military Veterans 142 19 426 Title Deeds Backlog (Pre-1994) 2789 6973 Title Deeds Backlog (Post-1994) 64414 2268 74583 Title Deeds (New Developments) 6817

14 PROGRAMMES FOR MINING TOWNS Total Budget Allocation per programme
Total Planned Sites Budget for Sites Total Planned Units Budget for Units Total Budget Allocation per programme Kgetleng Rivier 1 639 498 63 430 65 069 Madibeng 1 034 80 137 1 069 Matlosana 1 151 47 379 1 641 Moses Kotane 3 278 780 95 430 98 708 Rustenburg 2 070 Grand Total 4 255 5 627

15 PROGRAMMES PROPOSED NOT TO BE FUNDED BY THE HSDG
Total Planned Sites Budget for Sites Total Planned Units Budget for Units Total Allocation per programme 1.5a Rectified RDP Stock 1.5b Rectification of Housing Stock (pre 1994) 1.9 Blocked Projects 1.12 Housing Chapters of IDP's 2.1 Project Linked Subsidies (current commitments approved up to 31/03/07) 2.5b Consolidation Subsidies (Blocked Projects) 3.3a Community Residential Units (CRU) Converted/Upgraded Emergency Programme (existing units) TOTAL

16 PROGRAMMES THAT NEED ADDDITIONAL REPORTS
Total Sites Budget for Sites Total Units Budget for Units Total Allocation per programme 1.3 Enhanced Extended Discount Benefit Scheme (EEDBS) 1.4 State Asset Maintenance Programme 1.6 Social and Economic Facilities 1.8 Operational Capital Budget 1.11a Land parcels procured(IHAHSD) 4 012  Total

17 OTHER PROGRAMMES THAT ARE TO BE FUNDED
Total Sites Budget for Sites Total Units Budget for Units Total Allocation per programme 1.10 NHBRC enrolment (related to grant) 3.2a Social Housing: Operational Support 21 503 1.7 Accredited Municipalities (level 1 & 2): Disaster Relief 2 060 Total 23 563

18 CHALLENGES/ RISKS, REMEDIAL MEASURES TAKEN, ACTIONS REQUIRED FROM THE NATIONAL DEPARTMENT
MITIGATION MEASURES TAKEN BY THE PROVINCE ACTION REQUIRED FROM THE NDHS Lack of bulk infrastructure result in delays Project readiness matrix developed Pre-planning (land availability etc.) info not reliable Project readiness matrix to be verified and assessed Military Veterans – lack of qualifying beneficiaries due to income A reduction of targets needs to be seen through Projects no longer implemented (Rectification, Unblocking etc.) means remaining with the backlogs Auditing and quantification should be done Guidance being sought from NDHS on outstanding work

19 “We have come a long way – Celebrating 20 Years of Freedom!”
THANK YOU “We have come a long way – Celebrating 20 Years of Freedom!”


Download ppt "Presentation NORTH WEST PROVINCE"

Similar presentations


Ads by Google